My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A non-structural steel special inspection final report-2015
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2730 Kelley Parkway - 33-118-23-12-0007
>
Misc
>
A non-structural steel special inspection final report-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:43 PM
Creation date
3/28/2017 11:58:14 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> s Rau N <br /> INTERTEC <br /> Special Inspection Daily Report <br /> Ciiy of Orono Page: 1 of 1 <br /> Report No.: #33 Date: December 5,2014 <br /> Projecf Name: Orono Police Dept.Expansion Project No: 614-05902 <br /> P�ojecf Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN <br /> Clieni: City of Orono Client ProJect No.: <br /> Weather. Partly Cloudy Temperature: 20°F <br /> Type of Inspection: Inspedion Coverage: <br /> ❑ Continuous � Masonry � Rebar Placement ❑ Foundations ❑Special Cases <br /> � Periodic ❑ Welding&Bolting ❑Concrete ❑ Freproofing <br /> ❑ Piles 8�Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer authorize changes to approved plans8 Yes❑ (Listed Below) No � <br /> Description and location of work complefed <br /> -Observed the placement of rebar and grout for masonry wall Q Grid C.6-5.8 to D-5.8 at elevation 108'. <br /> -Observed the masonry contractor drill and epoxy#5 dowels every 48"on center intor the slab on grade for a masonry <br /> wall @ Grid 6.9-5.2 to B.9-b. <br /> List t�sts performad: I <br /> • Are there any discrepancies noted from this day's observations� Yes 0 No � <br /> • Are there any outstanding discrepancies on this project2 Yes ❑ No � <br /> . If yes,see attached 3ummary Sheet. <br /> . Reporf Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emalled to: <br /> Jack lirc:,nc_ryk-jack.bronc. .ryk�krausanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> ,-'%��,�.----� Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> -Providing engineering and enuironmental solutions siiice i957 <br />
The URL can be used to link to this page
Your browser does not support the video tag.