Laserfiche WebLink
Page 1 of 1 <br /> s Rau N <br /> I NTE RTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of t <br /> Report No.: #21 Dafe: October l,2014 <br /> Project Name: Orono Police Dept.Expansion Project No.: B14-05902 <br /> Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN <br /> CIIeM: City of Orono Clier�t Project No.: <br /> Weafh�r. Partly Cloudy Temperature: 50°F <br /> Type of Inspectlon: Inspection Coverage: <br /> ❑ Continuous �Masonry � Rebar Placement ❑ Foundations ❑Special Cases <br /> ❑ Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing <br /> ❑ Piles�Piers ❑Tendon Placement �Soils <br /> Did the architect or engineer authorize changes to approved ptans? Yes❑ �Listed Below) No � <br /> DoscrlpNon and location of work compl�f�d: <br /> -Observed the contractor grouting the existing foundation wall down to the e�usfing footing at each location of the new <br /> columns on the south side of the existing building. <br /> -Performed 4 compaction tests on interior wall backfill. The tests met project specifications of 95�o compaction. <br /> I <br /> llst tests perfoRned: <br /> I <br /> . Are there any discrepancies noted from this days observationsZ Yes ❑ No � <br /> • Are there any outstanding discrepancies on this project� Yes ❑ No � <br /> • If yes,see attached Summary Sheet. <br /> . Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emalled to: <br /> Jcac:k Rroncryk jack.broncryk@krausanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> �`r� �f Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> I <br /> Prouiding engineering and enuironmenta(soluiions since 1957 <br />