Laserfiche WebLink
Page 1 of 1 <br /> sRauN <br /> I NTE RTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of 1 <br /> Reporf No.: #22 Date: October 2,2014 <br /> Project Name: Orono Police Dept. Expansion ProJect No: 614-05902 <br /> ProJect Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK fLYNN <br /> Clier�t: City of Orono CII�M ProJ�ct No.: <br /> Weather. Cloudy Temperature: 50°F <br /> Type of Inspection: Inspection Coverage: <br /> ❑Continuous ❑Masonry ❑ Rebar Placement ❑ Foundations �Special Cases <br /> ❑ Periodic ❑Welding&Bolting ❑ Concrete ❑ Fireproofing Anchor Bolts <br /> ❑ Piles 8�Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer authorize changes to approved plans8 Yes❑ (Listed Below) No � <br /> Description and locafion of work complot�d: <br /> -Observed the contractor drill&epoxy anchor bolts into the top of the foundation wall�Grid B.l-6 to B.1-6.3 to B.9-6.9 to <br /> C.1-6.9. <br /> I <br /> List tests porfotmed: <br /> • Are there any discrepancies noted from this days observations2 Yes ❑ No � <br /> • Are there any outstanding discrepancies on this project2 Yes ❑ No � <br /> • If yes,see attached Summary Sheet. <br /> • Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Reporf Emailed to: <br /> Jac:k Rron�:ryk-jack.broncryk�krausanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specificat(ons and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> �-%����� Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> I <br /> Prouiding engineer�ttg and enuironrnental solunons stnce 19� <br />