Laserfiche WebLink
Page 1 of 1 <br /> sRauN <br /> I NTE RTEC <br /> Special Inspection Daily Report <br /> City of Orono Page_ 1 oF t <br /> Report No.: #20 Dafe: September 27,2014 <br /> ProJect Name: Orono Police Dept.Expansion ProJect No.: B14-05902 <br /> Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN <br /> Clie�: City of Orono CUent Project No.: <br /> Weath�r. Partly Cloudy Temperature: 70°F <br /> Type of Inspection: Inspection Coverage: <br /> ❑Continuous ❑Mpsonry ❑ Rebar Placement ❑ foundations ❑Special Cases <br /> ❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing <br /> ❑ Piles&Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No � <br /> Description and locaflon of worlc compiefed: <br /> -Picked up 1 set of 5-4�cylinders cast on 9-26-14. <br /> Usi tasts performod: <br /> . Are there any discrepancies noted from this days observations� Yes ❑ No � <br /> • Are there any outstanding discrepancies on this project6 Yes ❑ No � <br /> . If yes,see attached Summary Sheet. <br /> • Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Reporf Emailed to: <br /> Jack Bronczyk-jack.broncryk@krausanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications pnd <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> �l�% <br /> Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> -Prouiding engineering and enuironmentaf solutions since 1957 <br />