My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A non-structural steel special inspection final report-2015
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2730 Kelley Parkway - 33-118-23-12-0007
>
Misc
>
A non-structural steel special inspection final report-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:43 PM
Creation date
3/28/2017 11:58:14 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> sRauN <br /> INTERTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of 1 <br /> Raport No.: #19 Date: September 26,2014 <br /> ProJecf Name: Orono Police Dept.fxpcxnsion Project No.: B14-05902 <br /> ProJect Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN <br /> Clienf: City of Orono CNeM ProJect No.: <br /> Weaiher: Partly Cloudy Temperature: 70°F <br /> Type of Inspedion: Inspection Coverage: <br /> ❑Continuous ❑Masonry � Rebar Placement ❑ Foundations ❑Special Cases <br /> ❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing <br /> ❑ Piles&Piers ❑Tendon Placement �Soils <br /> Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No � <br /> DescripHon and location of work compl�fed: <br /> -Observed the placement of rebar for foundation wall Ca�Grid A-4.5 to A-6 to B-6. <br /> -Observed the placement of concrete for foundation wall C�?Grid A-4.5 to A-6 to B-6.Sampled and tested the concrete <br /> for slump,air content and temperature.Cast 1 set of 5-4x8 cylinders (Set#13). <br /> -Notified the contractor and Cemstone of the low air content(3.49a). Sampled and tested the next load of concrete and <br /> the air content was 5.4�. <br /> -Performed 3 compaction tests on interior wall bac�ll.The tests met project specifications of 95�compaction. <br /> Lis1 tests pertormed: <br /> Set#13=Slump-5",Air Content-3.4�,Temperature-76,Sample#47737 <br /> • Are there any discrepancies noted from this day's observations� Yes ❑ No � <br /> • Are there any outsianding discrepancies on this project2 Yes ❑ No � <br /> • If yes,see attached Summary Sheet. <br /> • Reporf Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emalled to: <br /> Jack Hronr.ryk-jnck.broncryk@krausanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable wakmanship provisions of the current IBC,except as noted above. <br /> ��� Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> I <br /> Providing engineering and environmental solutions since 1957 <br />
The URL can be used to link to this page
Your browser does not support the video tag.