Laserfiche WebLink
Page 1 of 1 <br /> s Rau N <br /> I NTE RTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 oF � <br /> Report No.: #18 Date: September 25,2014 <br /> Project Name: Orono Police Dept.Expansion Project No.: 814-05902 <br /> Proj�ct Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN <br /> Client: City of Orono Client Project No.: <br /> Weather: Partly Cloudy Temperature: 70°F <br /> Type of Inspection: Inspedion Coverage: <br /> ❑Corrtinuous ❑Masonry � Rebar Placement ❑ Foundations ❑Special Cases <br /> ❑Periodic ❑Welding&Bolting ❑Concrete Placement ❑ Fireproofing <br /> ❑Piles&Piers ❑Tendon Placement ❑ Soils <br /> Did the architect or engineer authorize changes to approved plans? Yes❑ (Listed Below) No � <br /> Description and Ixation of work completed: <br /> -Observed the placement of rebar for foundation wall cLD Grid A�.S to A�to B-6. <br /> List tests pertormed: <br /> • Are there any discrepancies noted from this day's observations? Yes❑ No � <br /> • Are there any outstanding discrepancies on this project? Yes ❑ No � <br /> • If yes, see attached Summary Sheet. <br /> . Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emailed to: <br /> Jack Bronczyk-jack.bronczyk@krausanderso�com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable <br /> workmanship provisions of the current IBC,except as noted above <br /> ,�i��,,,,�� Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> I <br /> Proriding engineering and environmental solutions since 1957 <br />