Laserfiche WebLink
Page 1 of 1 <br /> srtauN <br /> I NTE RTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of 1 <br /> Reporf No.: #9 Dale: September 12,2014 <br /> Project Name: Orono Police Dept.Expansion ProJecf No: 614-05902 <br /> Project Address: 2730 Kelly Pkwy. Braun IntQrtec PM: MARK fLYNN <br /> Client City of Orono Client P�oject No.: <br /> Woathar. Partly Cloudy TemperaturQ: 58°F <br /> Type of Inspection: Inspectlon Coverage: <br /> ❑ Continuous ❑Masonry �Rebar Placement ❑ Foundations ❑Special Cases <br /> � Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing <br /> ❑ Piles 8�Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No � <br /> Doscriptlon and locafiion of work compl�fed: <br /> -Observed the placment of rebar for footings Q Grid D to D.2 from 5 to 6. <br /> -Observed the placement of concrete for footings and column pads at the grids listed above. Sampled and tested the <br /> concrete for slump,air content and temperature. Cast 1 set of 5-4x8 cylinders(Set#2j. <br /> List tests perfortnad: <br /> Set#2=Slump:4.75",Air Content:3.496,Concrete Temperature:66F,Sample#45609 <br /> • Are there any discrepancies noted from this day's observations� Yes ❑ No � <br /> • Are there any outstanding discrepancies on this project8 Yes ❑ No � <br /> • If yes,see attached Summary Sheet. <br /> • Report Discussed with and Given to Contractor. Yes ❑ No ❑ <br /> Report Emailed to: <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> ,-���� Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> I'roufdin,q engineering and enuironmentalsolutions since 1957 <br />