Laserfiche WebLink
Page 1 of 1 <br /> sRauN <br /> INTERTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of 1 <br /> Report No.: #10 Date: September 15,2014 <br /> Project Name: Orono Police Dept. Expansion Project No.: 614-05902 <br /> ProjectAddress: 2730 Kelly Pkwy. Braun Infertec PM: MARK FLYNN <br /> Cliet�t: City of Orono Clienf Project No.: <br /> Weafher: Partly Cloudy Temperature: 57°F <br /> Type of Inspection: lnspeciion Coverage: <br /> ❑Continuous ❑Masonry � Rebar Placement ❑ Foundations ❑Speclal Cases <br /> ❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing <br /> ❑ Piles 8�Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer author¢e changes to approved plans� Yes❑ (Listed Below) No � <br /> Descriptlon and IocaHon of work completed: <br /> -Observed the placement of rebar for Foundation Walls @ Grid D-2.1 to D-5.1 and Footings @ Grid A-2 to A-4 <br /> Observed the placement of concrete for footings,foundation walls,and column pads at the grfds listed above. Sampled <br /> and tested the concrete for slump,air content and temperature. Cast 2 sets of 5-4x8 cylinders �Set#3&3et#4). <br /> lisl tesh perfoRnad: <br /> Set#3-Slump:5",Air Content:6.8%,Concrete Temperature:70F,Sample#45839 <br /> Set#4-Slump:4",Air Content:3.4�,Concrete Temperature;67F,Sample#45871 <br /> • Are there any discrepancies noted from this days observations? Yes ❑ No � <br /> • Are there any outstanding discrepancies on this project� Yes ❑ No � <br /> . If yes,see attached Summary Sheet. <br /> . Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emalled to: <br /> Jack Broncryk-jack.bronczykCa�krausanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,speclfications pnd <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> / <br /> � f����.--- Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> Providing engineering and environmental solutions since 1957 <br /> I <br />