Laserfiche WebLink
Pag e 1 of 1 <br /> s Rau N <br /> I NTE RTEC <br />� Special Inspection Daily Report <br /> I� CII�/ Of OTol10 Page: 1 of 1 <br /> Report No.: #8 Date: September 1 l,2014 <br /> ProJect Name: Orono Police Dept.Expansion Project No.: B14-05902 <br /> Project Address: 2730 Kelly Pkwy. Braun Interfec PM: MARK FLYNN <br /> Clier�t: City of Orono Client ProJect No.: <br /> Weafher. Partly Cloudy Temperature: 55°F <br /> Type of Inspection: Inspection Coverage: <br /> ❑Continuous ❑Masonry � Rebar Placement ❑ Foundations ❑ Special Cases <br /> ❑ Periodic ❑Welding&Bolting �Concrete ❑ Fireproofing <br /> ❑ Piles&Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer authorize changes to approved plans? Yes❑ (Listed Below) No � <br /> DescdpHon and loeallon of work complefed: <br /> -Observed the placment of rebar for Footings&Cofumn Pads C�?Grid C-1 to C-2 to D-2 to D-5. <br /> -Observed the placement of concrete for footings and column pads at the grids listed above. Sampled and teste the <br /> concrete for slump,air content and temperature. Cast 1 set of 5-4x6 cylinders(Set#1). <br /> list tests parfoRned: <br /> Set#1 =Slump-4 1/4",Air Content-3.296,Concrete Temperature-68F,Workorder#45402 <br /> . Are there any discrepancies noted from this day's observations� Yes ❑ No I81 <br /> • Are there any outstanding discrepancies on this project� Yes ❑ No � <br /> • If yes,see attached Summary Sheet. <br /> • Report Discussed with and Given to Contractor. Yes ❑ No ❑ <br /> Report Emailed to: <br /> To the best of our knowlecige,work inspected was done in accordance with the approved plans,spec�cations and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> ��� Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> Prouiding engineering and enuironmental solutions since i957 <br />