Laserfiche WebLink
Page 1 of 1 <br /> sRauN <br /> INTERTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of � <br /> Reporf No.: #7 Date: September 9,2014 <br /> Project Name: Orono Police Dept.Expansion Project No.: 814-05902 <br /> Project Address: 2730 Kelly Pkwy. Braun Interfec PM: MARK FLYNN <br /> Cllent City of Orono Clie�Project No.: <br /> Weather: Parfly Cloudy Tetnperafure: 65°F <br /> Type of Inspection: Inspection Coveraye: <br /> ❑Continuous ❑Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases <br /> � Periodic ❑Welding 8 Bolting ❑Concrete ❑ Fireproofing <br /> ❑ Piles 8�Piers ❑Tendon Placement �Soils <br /> Did the architect or engineer author�ze changes to approved plans� Yes❑ (Listed Below) No � <br /> Desc�ipiion and locafion of work compl�led: <br /> -Observed the soils in the bottom of the footing excavation for new addition at Grid A-2 to D-2 to D-6. Performed hand <br /> auger probes in the boltom of the excavation. The soils consisted of gray sandy lean clay.The soils appeared to be <br /> suitable for the designed footing bearing pressure of 2000 psf. <br /> I <br /> List tasts parfortnad: <br /> I <br /> • Are there any discrepancies noted from this day's observations2 Yes ❑ No � <br /> • Are there any outstanding discrepancies on this project� Yes ❑ No � <br /> • If yes,see attached Summary Sheet. <br /> • Report Discussed with and Given to Contractor: Yes ❑ No ❑ <br /> Report Emailed to: <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> / � �i Loosbrock, Tom �D.No.: 1136593 <br /> -ProUiding ettgineering and environmenta(solutions since igy� <br />