My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specs for garage entrance canopy
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2700 Kelley Parkway- 33-118-23-12-0007 - Public works
>
Misc
>
Specs for garage entrance canopy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:46 PM
Creation date
3/28/2017 10:42:57 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> , 10.6 CLAIMS FOR ADDTTIONAL COSTS <br /> If the Contractor wishes to make a claim for an increase in the Contract Sum, he shall give the <br /> � Engineer written notice thereof within ten (10) days after the occurrence of the event giving rise to <br /> such claim. This notice shall be given by the Contractor before proceeding to execute the Work, <br /> except in an emergency endangering life or property in which case the Contractor shall proceed in <br /> � accordance with Paragraph 10.7. No such claim shall be valid unless so made. ff the Owner and the <br /> Contractor cannot agree on the amount of the adjustment in the Contract Sum, it shall be referred <br /> � to the Engineer in accordance with Paragraph 7.8. Any change in the Contract Sum resulting from <br /> such claim shall be authorized by Change Order. <br /> � If the Contractor claims that additional cost is involved because of but not limited to (1) any written <br /> interpretation of the engineer, (2)any order by the Owner to stop the Work where the�ontractor was <br /> not at fault, (3) any written order for a minor change in the Work or (4) failure of payment by the <br /> � Owner, Contractor shall make such claim as provided in this Subparagraph. <br /> 10.7 WORK DURING AN EMERGENCY <br /> � 10.7.1 In any emergency affecting the safety of persons or property, the Contractor shall act to <br /> ' prevent threatened damage, injury or loss. In all cases he shall, as soon as practicable, notify the <br /> , Owner of the emergency and he shall not wait for the instructions before proceeding to protect both <br /> life and property. <br /> � 1�.7.2 Any additional compensation or extension of time claimed by the Contractor on account of <br /> said ern�;gency w�rk shall be determined under Paragraph 10.6. <br /> � <br /> SE�TION 11 <br /> � C�-IANGE OF CONTRACT PRICE AND CONTRA�T TIME <br /> 11.1 �UNTRACT PRICE <br /> ' The Contract Price constitutes the total compensation (subject to authorized adjustments) payable <br /> to Contractor for performing the R'ark. All duties,resgonsibiiities anck ob�igations assigned to or _ _ <br /> � und�rtak�r� by Contract�r shall be at his expense v�ithout ci:ange in ±�he �on�ract Pri��. <br /> , <br /> r <br /> � <br /> �ene�aU�pecsfCondms.gen <br /> �1996 Bonestra�,Rosene, <br /> � And:,r:ik 13 Assr�ciates,fnc;. -�� - <br />
The URL can be used to link to this page
Your browser does not support the video tag.