My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specs for garage entrance canopy
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2700 Kelley Parkway- 33-118-23-12-0007 - Public works
>
Misc
>
Specs for garage entrance canopy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:46 PM
Creation date
3/28/2017 10:42:57 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> 11.2 CHANGE IN CONTRA T PRICE � <br /> 11.2.1 Except where u it prices form the basis for payment under the Contract Documents, the <br /> Contract Price may only be changed by a Change Order. Any claim for an increase in the Contract , <br /> Price shall be based on written notice delivered to Owner and Engineer within ten (10) days of the <br /> occurrence of the event giving rise to the claim. Notice of the amount of the claim with supporting <br /> data shall be delivered within thirty (30) days of such occurrence unless Engineer allows an � <br /> additional period of time to ascertain accurate cost data. All claims for adjustment in the Contract <br /> Price shall be determined by Engineer if Owner and Contractor cannot otherwise agree on the <br /> amount involved. Any change in the Contract Price resulting from any such claim shall be � <br /> incorporated in a Change Order. <br /> 11.2.2 Where unit prices form the basis of payment and the quantity of any item of Work as given � <br /> in the Proposal is increased or decreased, payment for such item will be made on the basis of actual <br /> c�uantity completed, at the contract unit price for such item. � <br /> 11.3 BASIS OF CHANGE <br /> The method of determining the cost or credit to the Owner resulting from a change in the work shall � <br /> be deternuned and mutually agreed upon by Owner and Contractor in advance of perfor�nance of the <br /> change in work in one or more of the following ways: � <br /> 11.3.1 By mutual acceptance of a lump sum properly itemized, � <br /> 11.3.2 By unit prices stated in the Contract Documents or subsequently agreed upon (unit prices � <br /> shall �nclude an allowance for Contractor's main office expense, overhead, profit and bond), or <br /> 11.3.3 By actual cost of the changed work, lus an allowance for overhead su ervision an � <br /> P , p d profit, <br /> as defined as follows: <br /> � <br /> 1. The "cost of the changed work" shall mean costs necessarily incurred in the proper <br /> performance of the changed work and paid by Contractor at rates not higher than the standard paid <br /> in the locality of the work(exeept with prior consent of the Qwner) as more specifically df;fined as � <br /> follows: <br /> a. 'I'he cost ot the changed work �ha�l in�lude: , <br /> (1) Wages paid for labor in the direct employ of Contractor in the performance of the � <br /> changed work in the field or in the fabrication shop under applicable collective bargaining <br /> agreements or under a salary or wage schedule agreed upon by Contractor and Owner,plus <br /> a payroll markup of 40 percent to cover all overhead items applicable to payroll, such as � <br /> insurance, taxes, F.I.C.A., workmen's comp�nsation, unemployment taxes, and union <br /> benefits. <br /> (2) Cost of al} materials, supplies and eq_uipment incorporated in the changed work. � <br /> � <br /> Generiu/S 4tecs/Condtns.gen <br />�O 1I96 Bonestroo,Rosene, � <br /> Anderlik&Associates,Tnc. -42- <br />
The URL can be used to link to this page
Your browser does not support the video tag.