My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specs for garage entrance canopy
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2700 Kelley Parkway- 33-118-23-12-0007 - Public works
>
Misc
>
Specs for garage entrance canopy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:46 PM
Creation date
3/28/2017 10:42:57 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> SECTION 10 <br /> CHANGES IN THE WORK � <br /> 10.1 CHANGE ORDERS <br /> Without invalidating the Agreement, Owner may, at any time or from time to time, order additions, � <br /> deletions or revisions in the Work; these will be authorized by Change Orders. Upon receipt of a <br /> Change Order, Contractor shall proceed with the Work involved. All such Work shall be executed � <br /> under the applicable conditions of the Contract Documents. If any Change Order causes an increase <br /> or decrease in the Contract Price or an extension or shortening of the Contract time, an equitable <br /> adjustment will be made as provided in Section 10 or Section 11 on the basis of a claim made by � <br /> either party. <br /> 10.2 FIELD ORDERS ' <br /> Engineer may authorize minor changes in the Work not involving an adjustrr�ent in the Contract <br /> Price or the Contract Time, which are consistent with the overall intent of the Contract Documents. � <br /> These may be accomplished by a Field Order and shall be binding on Owner, and also on Contractor <br /> who shall perform the change promptly. If Contractor believes that a Field Order justifies an � <br /> increase in the Contract Price or Contract Time, Contractar may make a claim therefor as provided <br /> herein. _ <br /> 10.3 UNAUTHORIZED WORK � <br /> Additional Work performed without authorization of a Change Order will not entitle Contractor to � <br /> an increase in the Contract Price or an extension of the Contract Time, except in the case of an <br /> emergency. <br /> 10.4 �NGP�VE�R RECOMMENDATIONS , <br /> Owner shall execute appropriate Change Orders prepared by Engineer cavering changes ir�the`vVork � <br /> which are required by Owner,or required because of unforeseen physical conditions or emergencies, <br /> or because of uncovering Work found not to be defective, or because of any other claim oi� <br /> Contractor for a change in the Contract Time or the Contract Price which is recommended by , <br /> Engineer. <br /> 10.5 NOTICE OF CHANGE TO SURETY � <br /> If notice of any change affecting the general scope of the Work or change in the Contract Price is � <br /> required by the provisions of any Bond to be given to the Surety, it will be Contractor's responsibility <br /> to so notify the Surety, and the amount of each applicable Bond shall be adjusted accordingly. <br /> Contract�r shall furnish proof of such adjustment to Owner. � <br /> � <br /> GeneraUSpees/Cundtns.gen <br /> C'�1996 Bonestroo,Rosen,:, � <br /> :'��aderlik&Associates,Ir.�. _Q�_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.