My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specs for garage entrance canopy
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2700 Kelley Parkway- 33-118-23-12-0007 - Public works
>
Misc
>
Specs for garage entrance canopy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:46 PM
Creation date
3/28/2017 10:42:57 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � 9.11.2 If the Application and accomganying documentation are appropriate as to form and <br /> substance, Owner shall, within thirty days after receipt thereof pay Contractor the amount <br /> � recommended by Engineer. If, through no fault of Contractor, final completion of the Work is <br /> significantly delayed thereof and if Engineer so confirms, Owner shall, upon receipt of Contractor`s <br /> Final Application for Payment and recommendation of Engineer, and without terminating the <br /> � Agreernent, make payment of the balance due for that portion of the Work fully completed and <br /> accepted. <br /> � 9.11.3 If any remaining balance to be held by Owner for Work nat fully completed or corrected is <br /> less than the retainage stipulated in the Agreement, and if Bonds have been furnished as required <br /> herein, the written consent of the Surety to the payment of the balance due for that portion of the <br /> � Work fully completed and accepted shall be submitted by Contractor to Engineer with the <br /> Application for such payment. Such payment shall be made under the terms and conditions <br /> 1 governing final payment, except that it shall not constitute a waiver of claims. <br /> 9.12 CONTRACTOR'S CONTINUING OBLIGATION <br /> � Contractor's obliga�ion to perform and complete the Work in accordance with the Contract <br /> Documents shall be absolute. Neither recommendation of any progress or final payment by <br /> � Engineer, nor the issuance of a Certificate of Substantial Completion, nor any payment by Owner <br /> to Contractor under the Contract Documents, nor any use or occupancy of the Work or any part <br /> ' thereof by Owner,nor any act of acceptance by Owner nor any failure to do so, nor the issuance of <br /> � a notice of acceptability by Engineer pursuant to Sections 9.10 or 9.11, nor any correction of <br /> _ defective Work�y Owiner shall constitute an acceptance of Work not in accordance with the Contract <br /> Documents or a release of Contractor's obli�ation to perform the Work in accordance with the <br /> � Cantra�t Docurr�f;r�ts, <br /> 9.13 WAIVER OF�LAIMS <br /> , The makin and acce tance of final a ment shall constitute: <br /> g P PY <br /> i9.13.1 !1 waiver of all c�aims by Owner against Contractor, except claims arising from unsettled <br /> Liens,from defective work appearing after final inspection pursuant to Section 9.9 or from failure <br /> ' to comply with the Contract Documents or the terms of any special warranties or guarantees <br /> specified therein; however, it shall not constitute a waiver by Owner of any rights in respect to <br /> C�ntra�tor'�continuirrg ob�igati�ns urrder the C�ntract U�cum�nts;�nd— - - — — — <br /> � 9.13.2 �► v��aiver of all claims by Contractor against Ov�ner other than those previously made in <br /> writi�g and still unsettled. <br /> r <br /> � <br /> � t;enera'J�pecs/Cond,ns.gzn <br /> <<`4945 13o:;estri�o,2osene, <br /> � /'.•.�_ :K :S: .. .. _._.... . �z^ .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.