My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specs for garage entrance canopy
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2700 Kelley Parkway- 33-118-23-12-0007 - Public works
>
Misc
>
Specs for garage entrance canopy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:46 PM
Creation date
3/28/2017 10:42:57 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(d} Failure of the Contractor to make a ments to Subcontractors � <br /> P Y , matenalmen or <br /> suppliers. <br /> � <br /> (e) Damage to the Owner or any other person. <br /> (� Contractor's unsatisfactory prosecution of the work. � <br /> 9.5.2 When any of the above grounds for which payment is being withheld is r�moved, payment � <br /> shall be made for the amount withheld. <br /> 9.5.3 Should the Owner fail to pay a Request for Payment within 30 days from the date of � <br /> recommendalion of approval by the Engineer and should he fail to inform the Engineer and <br /> Contractor in writing of the reasons for withholding payment, the Owner shall pay to the Contractor <br /> simple interest on the past due amount at an annual rate equal to the manthly index of long term � <br /> United States bond yields for the month prior to the month in which the ob�igation is incurred plus <br /> an additianal one percent per annuni. <br /> 9.6 CONTRACTOR'S V�TARRANTY OF TTI'LE � <br /> Contractor warrants and guarantees that title to alt �Jork, mat�rials and equipment covered by any ' <br /> Application for Payment, whether incorporated in the Project or not, will pass to Owner at the time <br /> of payment free and clear of all liens,claims, security interests and encumbrances (hereafter in these � <br /> Conditions of the Contract referred to as "Liens"). <br /> 9.7 SUBSTANTIAL COMPLETION � <br /> 9.7.1 When Contractor considers the entire Work ready for its intended use Contrac�or shall, in <br /> writing to Owner and Engineer,certify that the entire Work is substantially cornplete and request that � <br /> Engineer issue a proposed Certificate of Substantial Completion. Within a reasonable time <br /> thereafter, Owner, Contractor and Engineer shall make an inspection of the Work to determine th� <br /> status of completion. If Engineer does nat consider the Work substantially complete, Engineer will � <br /> notify Contractor in writing giving his reasons therefor. ff Engineer considers the Work substantially <br /> complete, Engineer will prepare and deliver to Owner a proposed Certificate of Substantial <br /> Completion which shall fix the date of Substantial Completion. There shall be attached ta the � <br /> proposed Certificate a list of items ("punch list") to be completed or corrected before final payment. <br /> 9.7.2 Owner shall have seven days after receipt of the Certificate during which he may make wrirten � <br /> objection to Engineer as to any provisions of the Certificate or attached list. If, after considering <br /> such objections, Engineer concludes that the Work is not substantially complete, Engineer will � <br /> within fourteen days after submission of the proposed Certificate to Owner notify Contractor in <br /> wt�ting,stating his reasons therefor. If,after consideration of Owner's objections,Engineer considers <br /> the Work substantially complete, Engineer will within said fourteen days execute and deliver to � <br /> Owner and Contractor a final Certi�icate of Substantial Completion (with any revised list of items <br /> to be completed or corrected) reflecting such changes from the proposed Certificate as he believes <br /> justified after consid�ration of any objections from Owner. At the time of delivery of the proposed � <br /> Certificate of Substantial Completion Engineer will deliver to Owner and Contractor a written <br /> recommendation as to division of responsibilities pending final payment between Owner and <br /> Contractor with respect t� sccurity, operat:on, �afety, maincenance, heat, utilities ��rzd insur�nce. � <br /> GeneraUSpec;s/Condtns.gen <br />�J 1995 BenesVoo,Rose�e, � <br /> A:deriik&Assxiates,Inc. - 3b- <br />
The URL can be used to link to this page
Your browser does not support the video tag.