Laserfiche WebLink
� <br /> 8.8.3 Shop Drawings shall be submitted according to the following schedule: � <br /> (a) Not less than three copies or such other number of copies as may be required by the Special � <br /> Provisions shall be submitted with reasonable promptness and in such sequence as to prevent delay <br /> of the Work. <br /> (b) The Engineer shall, within fourteen (l4) days of the submittal of an Sho Drawin s return � <br /> Y P g , <br /> one copy to the Contractor marked with Engineer's comments. <br /> (c) The Contractor shall then rom tl make an necessa corrections or c • , � <br /> p p y y ry hanges to �he Shop <br /> Drawings to conform to the comments made by the Engineer. <br /> � <br /> (d) Following completion of such corrections or changes, the Contractor shall promptly <br /> resubmit to the Engineer the required number of copies of the revised Shop Drawings. � <br /> 8.8.4 Engineer will review with reasonable promptness Shop Drawings and samples,but Engineer's <br /> review shall be only for conformance with the design concept of the Project and for compliance with � <br /> the information given in the Contract Documents and shall not extend to means,methods,sequences, <br /> techniques or procedures of construction or to safety precautions or programs incident thereto. The <br /> review of a separate item as such will not indicate review of the assembly in which the item � <br /> functions. Contraetor shall make any corrections required by Engineer and shall return the required <br /> number of corrected copies of Shop Drawings and resubmit new samples for review. Contractor <br /> shall direct specific attention in writing to revisions other than the corrections called for by Engineer � <br /> on previous submittals. Contractor's stamp of approval on any Shop Drawing or sample shall . <br /> constitute a representation to Owner and Engineer that Contractor has either determined and veri�ed <br /> all quantities, dimensions, field construction criteria, materials, catalog numbers, and similar data !� <br /> or assumes full responsibility for doing so, and that Contractor has reviewed or coordinated each <br /> Shop Drawing or sample vvith the requirements of the Work and the Contract Documents. <br /> � <br /> 8.8.5 Where a Shop Drawing or sample is required by the Specifications, no related Work shall be <br /> commenced until the submittal has been reviewed by Engineer. ' <br /> 8.8.6 Engineer's review of Shop Drawings or samples shall not r�lieve �ontractor from <br /> responsibility for any deviations from the Contract Documents unless Contractor has in writing , <br /> called Engineer's attention to such deviation at the time or submission and Engineer has given <br /> written concurrence with the specific deviation, nor shall any concurrence by Engineer relieve <br /> Contractor from responsibility for errors or omissions in the Shop Drawings. � <br /> 8.9 ACCESS TO AND OBSERVATION OF SYORK <br />$.9.1 Engineer and Engineer's representatives, other representatives of Owner, testing agencies and � <br /> governmental agencies with jurisdictiunal interests will have access to the Work at reasonable times <br /> for their observation, inspection and testing. Contractor shall provide proper and safe conditions for � <br /> such access. <br /> � <br /> GenerallSpeLs/Condlns.t en <br />�i99u Bonestroo,Rosene, <br /> l;nderlik&Associates,Inc, - 30- � <br />