Laserfiche WebLink
i <br />� 8,6.8 Product Data shall be promptly submitted by the Contractor after he has reviewed, checked <br /> and approved the data to determine if they are in harmony with the requirements of the Project and <br />� with the provisions of the Contract Documents and after he has verified all field measurements and <br /> construction criteria, materials, catalog numbers and similar data. In submitting the Product Data, <br /> the Contractor certifies that the work represented by the data has been coordinated with the Contract <br />� �ocuments and all relevant field cor,ciitions. <br /> 8.; QU�LITY OF E�UIPIVIENT AND MATERLALS <br />� 8.7.1 In order tQ establAsh standards of ualit� ttie Er, ineer in th �� ' � <br /> q y, g , e Spec.�rcations, has referred t� <br /> certain products by name and catalog number. This procedure is not to be construed as eliminating <br />� from competition other products of equal or better quality by other manufacturers where fully <br /> suitable in design unless otherwise specifically stated in the Specifications (see Section 8.2 for <br />� substitution procedure). If a product referenced by catalogue name or number is no longer av��i2able, <br /> Contractor shall recommend to Owner and Engineer another product of comparable quality. <br />� 8.7.2 The Contractor shall furnish the complete list of proposed desired substitutions prioi• to <br /> executing the Agreement, together with such engineering and Product Data as thr Engis�eer may <br /> require. <br />� 8.7.3 The Contractor shall abide �y the Engineer's recommendation when proposed substitut� <br /> � materials or items of equipment are not re,commended for installation and shall furnish the specifiecl <br />� Iraterial or item of equipment in such case. All proposals for substitutions shall be submitted in <br /> . writing by the General Contractor and not by individual trades or material suppliers. The Engineer <br /> wi�i reviev.� prapostd s��bstitutions and m�ke h:s recs�mmenda?ion in wi-it;ng within a reason�b�� <br />� tim�. <br /> �.8 SHOP DRAWINCS <br />� , <br /> b.8.1 The Contractor shall provide Shop Drawings, settings, schedules anc���ic;h other drawi��s �::� <br /> lnay be necessary �ar the prosecution of the Work in the shop and in the field as required �y the <br />' Drawings, Specifications or Engineer's instructions. Deviations from the Drawings an� <br /> Specifications shall be called to the attention of the Engineer at the time of the first submission of <br />� Shop Drawings and other drawings for approval. The E�gineer's revgew of any drawings shall nos: <br /> reiease the Cor�tra�tc;r fror-i responsibility for such devaations. <br />� 8.8.2 Sho�Drawings shail be�rc�mntiv�su_hmitted t�y th�Curitcactor a.`Eer he has revie����, ch�eked <br /> and approved the data to determine that they are in harmony with the requirements of the Project and <br /> with the provisions of the Contract Documents and after he has verified all field measurements and <br />� �onstruction criteria,materials,catalog numbers and similar data. By submitting the Shop Urawings, <br /> the Contractor certifies that the work represented by the Shop Drawings has been coordinated with <br /> the Cc�ntract �ocur�ents �nd �I� rele��a�t field condition�. <br />� <br />� <br /> c�e�:,railSpecsl€�oa,t�tns.geza <br /> s; t946R2nw.str�a,lte*sene. <br />� ..,e�i-`?i�-<_� .-_,. :,�ea'�.�'.,1t°�. � �� — - <br />