28. Upon completion of work,conduct continuity,short circuit and fall of potential ground te for <br /> approval.Submit test reports to the Contractor.Clean premises of all debris resulting from ork and _ <br /> leave work in a complete and undamaged condition. <br /> 29. Sub-contractor shall coordinate with the utility company for connection of temporary and p rmanent <br /> power to the site.The temporary power and all hookup costs to be paid by Sub-contractor. <br /> 30. IEEE Fall of Potential Tests: Ground tests shall be performed as indicated on drawings.A iddle <br /> ground ohmer or the method of using two auxiliary ground rods(as described in IEEE stan d no. <br /> 81-1983,part 1)may be used.The IEEE method requires the use of an ac test cun�en�The uxiliary <br /> test rods must be sufficiently far away from the rod under test so that the regions in which eir <br /> resistaace is localized do not overlap. Sub-contractor shall submit a ground resistance test the <br /> Contra�tor for review and approval.After all the external ground rings are tied together but efore the - <br /> equipment cabinet is tied down,a megger check of the ground system should be done.All orts <br /> shall be made to achieve a 5 OHMS to ground resistance reading.The maximum allowable <br /> resistance is 10 OHMS to ground.Where this is not achievable,inform Contractor in writin . <br /> 31. Grounding Resistance Test Report:Upon completion of the testing for each site,a test repo <br /> showing resistance in OHMS with auxiliary potential electrodes at 5 feet and 10 feet interv s until <br /> the average resistance starts increasing and also note t6at 10.15 photos must be taken to p f entire <br /> external ground ring system before backfill or notify Contractor no less than 48 hours in ad ance of <br /> backfill.Testing shall be completed by Sub-contractor and two(2)sets of test documents to be <br /> bound and submitted within one week of work completion. <br /> 32. Coaxial Cable Installation: Coaxial cable size shall be installed as shown on the drawings. e <br /> _ minimum bending radius for the 7/8"aad 15/8"cable is two feet(2').Coaxial cable suppo .The <br /> coaxial cable shall be run in covered cable trays.For short distaaces the coaxial cable may e on bare - <br /> nu�s with supports every four feet(4').in horizontal nins,and every three feet(3').in verti 1 nms. <br /> The coaxial cable shall be run inside the monopole and supported from Kellum Grips with' the <br /> monopole.From the monopole to the Primary Radio Cabinet,the cable shall be supported' covered <br /> cable trays.The coaxial cable shall be supported on open waveguides on structural towers. e <br /> coaxial cables shall be sealed where the cables penetrate any rooftop,bulkheads,monopole ,and <br /> walls. _ . <br /> 33. Coaxial cable gounding:The coaxiat cables shall be gounded to a grounding bar at the ante as <br /> using the grounding kits as specified on the drawings.The coaxial cables shall be gounded a <br /> grounding bar at the Radio cabinet using the grounding kits as specified on the drawings. e coaxial <br /> cables shall be gounded to.a grounding bar at the top and bottom of the monopole using the <br /> grounding kits as specified on the drawings.The coaxial cables shall be grouaded to a gro d baz at <br /> the bulkheads using the grounding kits as spec�ed on the drawings. <br /> 34. Coaxial cable sweep testing:After the installation of the antenna system,the coaxial cables coaxial <br /> cables shall be sweep tested up to 2000 Mhz.to determine the acceptability of system re loss,the <br /> reflection coefficient,and the VSWR. <br /> 35. Grounding Electrode System <br />� Grouading Connections <br /> a. All underground(below grade)grounding connections shall be made by the"cadweld" cess. <br /> Connections shall include all cable to cable splices,Tees,Xs,etc.All cable connections o ground <br /> CNS/[TS WEST COMMUNICATIONS ELECTRICAL MATERIALS AND ODS <br /> SMMA NO.96419.16 16000-3 17 DEC.96 <br />