My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project manual-2005
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2670 Kelley Parkway - 33-118-23-12-9999 Unit #100-common areas of condo bldg.
>
Misc
>
Project manual-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:57 PM
Creation date
3/27/2017 1:41:32 PM
Metadata
Fields
Template:
x Address Old
Address
2670 Kelley Pwky
Document Type
Misc
PIN
3311823129999
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> SECTION 01200 <br /> SPECIAL CONDITIONS <br /> 1. Scope: Scope of Work is defined in the Drawings and Specifications, dated October 4, 1999. <br /> 2. Insurance: The followin t es and amounts of insurance shall be carried by all Subcontractors: <br /> g YP <br /> A. Worker's Compensation Insurance, Public Liability and Unemployment insurance <br /> as required by Law. <br /> B. Bodily injury insurance: $500,000 single limit. <br /> C. Property Damage Insurance: $500,000 single limit. <br /> D. Automobile Bodily Injury Insurance: $500,000 single limit. <br /> �� Subcontractors waive all rights against the Owner for damages to persons or property caused by <br /> �� fire or other casualty. <br /> � <br /> ,� Each Subcontractor shall furnish to the GC satisfactory proof of coverage of insurance <br /> required; with the Certificate of Insurance forwarded immediately after the award of the <br /> _� contract. No payment shall be made until this item is received. <br /> �� nd a ortable toilet. <br /> 3. The GC shall provide a temporary office a p <br /> �� 4. Each Subcontractor shall at all times keep the premises free from accumulation of waste <br /> � materials or rubbish, caused by his employees or work on a daily basis and; at the completion <br /> ,� of the Work, he shall remove all rubbish from and about the building, and all tools, scaffolding <br /> ,�� and surplus materials and shall leave his work area broom clean. If a subcontractor fails to <br /> comply with these clean-up requirements, the GC will (after notification), do the necessary <br /> clean-up and back-charge the cost of said clean-up to the applicable Subcontractor(s). If a <br /> �'� dispute arises between separate Subcontractors as to their responsibility for cleaning up, the GC <br /> may allocate the responsibility per his own discretion. <br />��� 5. Non-Conforming work: In the case of faulty or defective Work; the GC shall have the option, <br /> eF-�et�t�rr��3�h�ve�to takP aTnronri�..te reduction to the contract sum. <br /> 6. Supervision: Each Subcontractor shall provide a competent foreman to supervise the <br /> construction of his work. <br /> � 7. Governing Law: The law governing this shall be the law of the jurisdiction in which the Project <br /> is located. <br /> �� <br /> � Division 1 -Section 01200 <br /> Page 1 of 2 <br /> ��' <br />
The URL can be used to link to this page
Your browser does not support the video tag.