Laserfiche WebLink
� Mastic, spray or troweled, or equal. Apply 6 mil <br /> polyethylene over dampproofed areas & seal at top. <br /> 15. Grace Ice & Water Shield waterproofing barrier; apply <br /> at first 5 ' of roof edge & at roof valley & junctures <br />� � (chimneys, etc. ) . . <br /> 16. Roof ridge vent w/ shingle cap; Ridge Master Plus, <br /> Mid-America Bldg. Prod. Corp. Provide shingle strip <br /> cap to match. <br /> 17. 6 mil polyethylene air/vapor barrier cont. , caulk edges <br /> & joints w/ acoustical sealant, or use 3M Polyfilm <br /> Adhesive, or polyethlylene tape. Seal all openings <br /> in walls & ceiling incl. window/door, outlets, light <br /> boxes, vents, etc. to prevent air leakage. <br /> 18. 2x6 studs @ 16" o.c. typical; R-19 fiberglass batts <br /> w/ double thickness R-38 at rim joist areas. Pack <br /> window/door frame to stud gap w/insulation, see vapor <br /> barrier item. <br /> 19. �" orientated strand board (Ox-board) sheathing w/plywood <br /> clips as required by Code. <br /> 20. �" orientated strand board (Ox-board) sheathing. <br /> 21. 15 lb. roofing felt over sheathing; 2 layers @ stucco <br /> walls per Code. <br /> 22. �" gypsum board, provide all metal corner & edge trim <br /> as required. <br /> 23. Provide metal L-trim where gypsum board is flush w/ <br /> hardwood or other dissimilar material. Keep joint clean <br /> of material. <br /> 24 . Treated post, w/ galvanized post to concrete connector <br /> base fastened to 2" round threaded anchor bolt, 1" air <br /> space below post. <br /> �5. R-40 insulation at roof (12" +) , fiberglass batts or <br /> equal. Provide air tight connections at all penetrations <br /> thru ceiling. <br /> 26. Owens Corning, R-38C denser fiberglass insulation, 10�" <br /> thk. for vaulted ceilings, maintain 1" air space. <br /> 27. Thru-wall flexible flashing, Nervastral Seal-Pruf HD. <br /> 28. Rope weeps in vertical joints at 24" o.c. <br /> 29. Sealant w/ backer rod, color to match. <br /> 30. Tie existing attic vent space w/ new attic area, cut <br /> holes in existing sheathing board. <br /> l-31. New siding to match existing; reuse existing material <br /> removed from garage & portion of house. <br /> 32. Existing garage, slab & foundation to be removed, reuse <br /> existing materials where possible. <br /> 33 . Existing windows relocated to new addition, provide <br /> jamb extentions for 2x6 stud walls & reuse existing <br /> casings. <br /> � �- 34 . 3/4" t & g orientated strand board (ox-board) subfloor. <br /> ' 35. New facia boards. & soffits to match existing; provide <br /> soffit vents as required. <br /> 36. Revise & add gutter & downspout to match existing at <br />