Laserfiche WebLink
these locations only. <br /> 37. Remove existing beam, portion of wall, etc, as required <br />� for new work; brace structure; install new beam as noted <br /> w/ continuous support below new posts. <br /> 38. Remove portion of wall, ceiling or floor; windows, doors; <br /> electrical, plumbing or mechar_�cal; or any work required <br /> for new construction; brace structure. <br /> 39. Remove concrete steps & platform. <br /> 40 . Existing roof edge, tie new roof in with existing, new <br /> supports to bear on existing wall . <br /> 41 . Anderson, Perma-Shield gliding patio door, PS 9, 2x6 <br /> stud jamb extentions, color to match. <br /> �42 . Window seat, coat closet & T.V, built-in cabinet, top <br /> at 7 ' -0" +; verify finish materials with Owner. <br /> 43 . New wood landing & steps to tie into existing walk, <br /> verify materials w/Owner. <br /> 44 . 6x6 treated wood post w/ 3/4" wood wrap, provide 15 <br /> lb. felt & see Keynote #24 . <br /> �45 . Retaining wall at drop in grade, verify materials <br /> with Owner. <br /> 46 . Insulated flush panel, wood faced garage door, smooth <br /> . surface, 1 3/8" thick. Provide 1/3 h.p, door openers <br /> w/ transmitter as required; reuse existing operator, <br /> verify with Owner. <br /> �47. Asphalt shingies over 15 lb, roofing felt to match <br /> existing, double starter course. <br /> 48 . Provide deduct alternate to reduce soffit height at <br /> garage to 7 ' -6" +, see dotted condition @ 3/A2 . <br /> ,t-� 49. Morgan entry door, #E-5019, and 2 - 14" wide side <br /> lights #F-5701, prehung with brick mold & trapezoid <br /> , transom above as shown, 2x6 jamb extensions, unit width <br /> 5-82. <br /> S0 . Plumbin� - Locate hose bib, verify location w/ Owner. <br /> � 51 . Bituminous driveway, provide 4" crushed rock stabilized <br /> base & 3" bituminous mat compacted to 22" , Cut & fill <br /> grade to be a smooth transition from existing curb to <br /> garage; provide compacted granular fill to 95$ of <br /> Standard Proctor (ASTM 698 ) as required. <br /> �52 . Contractor to survey & verify existing grade elevations <br /> prior to starting work & verify relationships of new <br /> slabs to finish grade; modifications to finish grade <br /> & slab elevations may be required. <br /> �, 53 . Mechanical - provide modified distribution system as <br /> required for heating/cooling new addition; verify exact <br /> locations of new supply & return grilles w/Owner. <br /> 54 . Electrical - provide new electrical work as required <br /> per Code, verify lighting requirements w/Owner. <br /> 55 . Mechanical - heated crawl space, insulated with 12" <br /> Thermax, R-12, faced w/vapor barrier foil w/taped <br /> joints (as per Code for exposed insulator) to top of <br /> frost footing & pack rim joist area with fiberglass <br />