My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
structural & inspection info
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
200 Hollander Road - 25-118-23-44-0015-HISTORICAL FILE
>
Structural info/inspection info
>
structural & inspection info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:26 PM
Creation date
2/21/2017 12:26:58 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Hollander
Street Type
Road
Address
200 Hollander Road
PIN
2511823440015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � � � � � � � � � � � � � � � � � � <br /> i,,.,o�n �nn� �uly 3, 2002 Page 1 <br /> Hollander Residence Limited Structural Evaluation. <br /> MGI Commission#02162 <br /> for Mr. John Hollander <br /> RELATIVE REPAIR SCHEDULE <br /> This schedule contain information relating to the required repairs to the Hollander residence. Please see the evaluation report for specific details <br /> regarding the repairs. <br /> Description _ Relative Time period Latest date to Beain/Occur <br /> 1. Tentative approval with the City of Orono to the approach being taken '��^�" �nn� July 3, 2002 <br /> 2. Completion of the evaluation report '��'���� July 10, 2002 oR 'S� <br /> 3. Final approval with the City of Orono to the approach being taken. This will be by �-�AA� July 15, 2002 <br /> reviewing and accepting the final evaluation report. Building permit will be issued at <br /> that time for any work to be performed that may need a building permit. Conditional <br /> requirements for submittals as required for the HVAC shall be defined within the <br /> building permit. Limited access to the residence shall be granted beginning at this <br /> time to permit the site bidding/observation as required. <br /> 4. Bidding period for the required work. '� '���� July 10, 2002 <br /> 5. Review of bids and awarding of the work. ��������/ <br /> 6. Start of repairs WORK IN PROGRESS d��l�„ '�,- �,�-'� July 22, 2002 <br /> 7. Foundation wall repair performed. '��'�� '�--�, '-�= July 22, 2002 <br /> 8. Floor framing member repairs made. '��'��'�,- '�� July 24, 2002 <br /> 9. City Inspection of foundation wall repairs and floor framing repairs. July 29, 2002 <br /> 10.Interior of house cleaned and contents repositioned to allow for full un-obstructed July 29, 2002 <br /> access from others that will be in the structure performing repairs. <br /> 11.Electrical repairs made, if required. August 1, 2002 <br /> 12.Heating/Ventilation repairs made. August 1, 2002 <br /> D�����, <br /> continued on next page,,,,, <br /> WORK IN PROGRESS <br />
The URL can be used to link to this page
Your browser does not support the video tag.