My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
structural & inspection info
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
200 Hollander Road - 25-118-23-44-0015-HISTORICAL FILE
>
Structural info/inspection info
>
structural & inspection info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:26 PM
Creation date
2/21/2017 12:26:58 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Hollander
Street Type
Road
Address
200 Hollander Road
PIN
2511823440015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> July 03, 2002 Page 5 <br />� Hollander Residence Limited Structural Evaluation. <br /> MGI Commission#02162 <br /> for Mr. John Hollander <br />' REPAIRS DEFINED WITHIN THE CITY'S RESOLUTION WITH RESPONSES, continued: <br /> Summarv <br />� The intent of this document is to provide a rational reasonable approach to resolving the deficiencies relating to this <br /> residential structure as identified within the City resolution. <br />' What is presented here is the initial approach direction for all parties to review and agree upon, in principle. The final <br /> approach will be created upon tentative approval by the City of these approaches to this situation. The final <br /> approach will be this document refined and the refined calendar. These final documents will then be submitted to <br />' the city for their approval of this approach. Mr. Hollander will take bids on the required work. This document will be <br /> re-submitted to the City with any defined changes and scope of work definitions for the purpose of obtaining a <br /> building permit for the given work. A conditional building permit could then be issued, conditional upon the continued <br /> substantial adherence to the given work description and schedule. Variation from the given schedule or work could <br />� result in loss of the building permit. <br /> Fire ratings, means of egress, ADA requirements, new cladding design/attachments or any other factor not <br /> specifically addressed within this report is excluded from this report. <br />' Due to the nature of the structure, additional movement, deflection, cracking etc. may occur with changes to the <br /> house structure. Based upon our review, there were no apparent signs of significant structural distress. This <br />' structure should be sound if repairs and proper maintenance are provided as required. <br /> Report notes, photographs, sketches, etc. that were used in the preparation of this report will be kept on record in <br /> our files. <br />' ,] i <br /> Respectfully; �������� <br />' The McSherry Group, Inc. <br /> WORK IN PROGRESS <br /> Douglas L. Fell, P.E. <br />' Director, Structural Engineering Services <br /> CEO <br /> cc: Project File <br />� Evaluation Report File <br /> I hereby certify that this plan, specification, or report was prepared <br />' by me or under my direct supervision and that I am a duly Licensed <br /> Professional Engineer under the laws of the state of Minnesota. <br /> Signature <br />� Typed or Printed Name: Douqlas L. Fell <br /> Date: Reg. No. <br />' Certification is only for page(s) of this report dated <br />' CONCLUSION OF REPORT <br />' <br />' <br />
The URL can be used to link to this page
Your browser does not support the video tag.