Laserfiche WebLink
� � � � � � � � � � � � � � � � � � � <br /> i��„o�n �nn� July 3, 2002 Page 2 <br /> Hollander Residence Limited Structural Evaluation. <br /> MGI Commission#02162 <br /> for Mr. John Hollander <br /> RELATIVE REPAIR SCHEDULE, continued <br /> Description Relative Time period Latest date to Beain/Occur <br /> 13.Plumbing repairs made. August 1, 2002 <br /> 14.Windows cleared of plastic and made to be operable and lockable. August 1, 2002 <br /> 15.City inspection of electrical/heating/ventilation and plumbing and window repairs. August 9, 2002 <br /> 16.Mr. Hollander moves back into the house. August 9, 2002 <br /> 17.Exterior of house is prepped, caulked and painted. September 3, 2002 <br /> 18.City inspection of house exterior work. September 3, 2002 <br /> ��������i <br /> WORK IN PROGRESS <br />