My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
structural & inspection info
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
200 Hollander Road - 25-118-23-44-0015-HISTORICAL FILE
>
Structural info/inspection info
>
structural & inspection info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:26 PM
Creation date
2/21/2017 12:26:58 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Hollander
Street Type
Road
Address
200 Hollander Road
PIN
2511823440015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> July 24, 2002 Page 5 <br />' Hollander Residence Limited Structural Evaluation. <br /> MGI Commission#02162 <br /> for Mr. John Hollander <br />' REPAIRS DEFINED WITHIN THE CITY'S RESOLUTION WITH RESPONSES, continued: <br />' Interior <br /> City: "Provide code compliant windows to provide required amounts of light and ventilation." <br /> Response: The plastic covering over the existing windows will be removed. The existing windows will be repaired <br />� or replaced so that they are operable. Additional plastic may be added to the windows as part of the <br /> late fall winterization of the house, but will be installed with the intent that the plastic will be removed <br /> when the warmer weather arrives next spring. <br />� City: "Replace plaster in ceiling where needed." <br /> Response: The plaster will be removed in the few areas that the plaster is failing in the upper bedroom areas and <br /> replaced with either plaster or a combination of gypsum board and plaster to provide a stable interior <br />' finish. <br /> Plumbinq <br />� City: "Repair or replace bathroom sink with code compliant material. <br /> Response: The bathroom sink will be repaired or replaced to be code compliant. <br />' City: "Provide venting to meet Plumbing Code." <br /> Response: The entire plumbing system will be reviewed by a licensed plumber. Prices will be taken to have the <br /> plumbing system upgraded. Suggestions from the plumber witl be taken and discussed with the City for <br />' any options that may be available to Mr. Hollander. <br /> City: "Replace damaged and missing tiles and sanitize bathroom and kitchen." <br /> Response: Missing tiles are to be repaired/replaced and the bathroom and kitchen are to be sanitized. <br />' Heatinq <br />� City: "Replace missing doors and contract with a licensed mechanical contractor to evaluate the <br /> system and repair as needed." <br /> Response: It is the intention of Mr. Hollander to utilize the services of a licensed mechanical/electrical contractor to <br /> determine the type of heating/ventilating/air conditions systems to utilize within this residence. The <br />� existing central heating system will be removed and the existing electrical baseboard heating will be <br /> utilized either by itself or in conjunction with additional electrical baseboard heating or central heating <br /> system. The final systems will be presented to the city prior to installation. <br />' Electrical Svstem <br /> City: "Electrical system must be inspected by State Electrical Inspector and upgraded as required." <br />' Response: The electrical system was just recently upgraded. Some work will be performed on the electrical <br /> system as part of the other work that is needed to be performed, (heating/ventilating). Electricians will <br /> be utilized to oversee the electrical work and a final electrical inspection will be called for. <br />' <br />' <br /> 1 <br />' <br />
The URL can be used to link to this page
Your browser does not support the video tag.