My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01353 - land alteration
Orono
>
Property Files
>
Street Address
>
H
>
Highwood Road
>
4195 Highwood Road - 07-117-23-44-0095
>
Permits/Inspections
>
2015-01353 - land alteration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:41:07 PM
Creation date
2/16/2017 2:36:24 PM
Metadata
Fields
Template:
x Address Old
House Number
4195
Street Name
Highwood
Street Type
Road
Address
4195 Highwood Rd
Document Type
Permits/Inspections
PIN
0711723440095
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditional Use Permit 15-3725 <br />. r 4167 Highwood Road <br /> Page 2 <br /> to be used,and location and elevation of timbers. <br /> 7. Since work is proposed within 50' of Lake Minnetonka,redundant erosion control devices must be <br /> installed down gradient from the work to ensure adequate protection. Double rows of silt fence <br /> should be installed by the Contractor and inspect�d by the City prior to any land disturbing activities. <br /> Silt curtain should also be installed where shoreline remediation and riprap placement is proposed. <br /> 8. Disturbed areas must be permanently stabilized within 7 days of completing grading and wall <br /> construction operations. The Green-Dale Design Plan should be revised to indicate locations and <br /> schedule for re-vegetation or a Landscape Plan should be submitted with the necessary information. <br /> 9. Due to the extent of work proposed,it is recommended that a financial security of$5,000 for erosion <br /> control and engineering oversight be required of the Applicant. The financial security is intended to <br /> provide protection in the event that it becomes necessary for the City to install or maintain erosion <br /> and sediment control within the project azea and covers the cost of vegetation re-establishment if the <br /> applicant is unable to follow through with the conditions of approval. <br /> 10. The Minnehaha Creek Watershed District(MCWD)permit submitted appears to be out of date and <br /> does not adequately cover the work proposed.The applicant should resubmit plans to MCWD and <br /> may be required to obtain new MCWD approval and permitdng for their Erosion Control,Shoreline <br /> and Streambank Stabilization,and Floodplain Alteration Rules. A copy of any approved permits <br /> should be submitted prior to any land altering activities. <br /> Please let me know if you have any questions or need additional information. <br /> Sincerely, <br /> BOLTON&MENK,INC. <br /> sc3Cd��.►�'G�.��a� <br /> Y <br /> Robert E.Bean,Jr.,P.E. <br /> Water Resources Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.