Laserfiche WebLink
PC Exhibit F <br /> • = BOLTON � M �N K , INC� <br /> • Consulting Engineers & Surveyors <br /> '� 2638 Shadow Lane, Suite 200•Chaska, MN 55318-1172 <br /> Phone(952)448-8838•Fax(952)448-8805 <br /> www.bolton-menk.com <br /> June 3, 2015 <br /> � RONO COPY <br /> City of Orono O <br /> Attn: Melanie Curtis <br /> 2750 Kelley Parkway <br /> Orono,MN 55356 <br /> RE: CUP Application 15-3725 <br /> 4167 Highwood Road <br /> Engineering Review#1 <br /> Dear Melanie: <br /> As requested, we have completed an engineering review of the documents submitted for the above <br /> referenced project. We offer the following observations,comments, and recommendations for your <br /> consideration: <br /> 1. The Applicant is proposing to perform site grading of approximately 415 cubic yards and install <br /> riprap along the shoreline. If material is to be imported to the site,the City should consider the <br /> following: <br /> a. The City Engineer should be allowed to inspect any riprap or fill being imported to the site prior <br /> to it being placed. <br /> b. The Applicant should confirm with the City Engineer acceptable hours of truck hauling and <br /> provide documentation on the haul route to be used. Acceptable hours and haul route should be <br /> approved prior to the importing of any riprap or fill. <br /> c. The City Engineer should inspect roadways on haul route prior to and following completion of <br /> work to determine whether adverse impacts have occurred.The applicant should be responsible <br /> for the repair to roadways for any adverse impacts. <br /> 2. It is uncleaz what information is portrayed on the Green-Dale Design Plan. A legend should be <br /> included that defines existing and proposed features indicated on the plan. <br /> 3. It appears that work is proposed below the 100 year flood elevation. Any fill below this elevation <br /> must be mitigated for prior to any fill being placed in the floodplain. Plans should be revised to <br /> indicate location and amount of floodplain fill proposed and location and amount of floodplain <br /> mitigation provided. <br /> 4. The information submitted indicates riprap is to be installed to stabilize the shoreline. However,the <br /> plans are unclear where riprap is to be placed. The plans should be revised to clearly indicate <br /> location of riprap. The size of rock to be used for shoreline stabilization should be specified on the <br /> plan. Minimum Class V riprap(6"to 30")is recommended. <br /> 5. The plans are unclear what is proposed for retaining walls. The Green-Dale Design Plan should be <br /> revised to provide more detail for all proposed retaining wall work. Top of wall and bottom of wall <br /> elevations should be provided in key locations (i.e. grade changes and alignment changes). Spot <br /> elevations provided should clearly indicate location of proposed elevation. Walls four feet or greater <br /> in height must be designed by a Professional Engineer, and plans and calculations specific to the <br /> proposed walls must be submitted for review and approval. Multi-level walls spaced less than <br /> double the height of the bottom wall apart shall be considered one wall, and the height shall be <br /> determined from the base of the bottom wall to the top of the upper wall. <br /> 6. The plans should be revised to include cross-section details of the proposed work to indicate how <br /> walls will be integrated with�riprap at the toe of slope, location of draintile and tie-backs,fill material <br />