Laserfiche WebLink
• = BQLTON 8� M � N K , I NC� <br /> . ¢ Consulting Engineers & Surveyors <br /> �� 2638 Shadow Lane, Suite 200 •Chaska, MN 55318-1172 <br /> Phone(952)448-8838• Fax(952)448-8805 <br /> www.bolton-menk.com <br /> August 24, 2015 <br /> City of Orono RONO �Op� <br /> Attn: Melanie Curtis 0 <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> RE: CUP Application 15-3725 <br /> 4167 Highwood Road <br /> Engineering Review#2 <br /> Dear Melanie: <br /> As requested, we have completed an engineering review of the documents submitted for the above <br /> referenced project. We offer the following observations, comments, and recommendations for your <br /> consideration: <br /> 1. The Applicant is proposing to perform site grading of approximately 100 cubic yards and install <br /> riprap along the shoreline. If material is to be imported to the site, the City should consider the <br /> following: <br /> a. The City Engineer should be allowed to inspect any riprap or fill being imported to the site prior <br /> to it being placed. <br /> b. The Applicant should confirm with the City Engineer acceptable hours of truck hauling and <br /> provide documentation on the haul route to be used. Acceptable hours and haul route should be <br /> approved prior to the importing of any riprap or fill. <br /> c. The City Engineer should inspect roadways on haul route prior to and following completion of <br /> work to determine whether adverse impacts have occurred. The applicant should be responsible <br /> for the repair to roadways for any adverse impacts. <br /> 2. Perimeter erosion control measures should be installed by the Contractor and inspected by the City <br /> prior to any land disturbing activities. <br /> 3. Disturbed areas must be permanently stabilized within 7 days of completing grading and wall <br /> construction operations. The Green-Dale Design Plan should be revised to indicate locations and <br /> schedule for re-vegetation or a Landscape Plan should be submitted with the necessary information. <br /> 4. The size of rock to be used for stabilizing the base of the sub-wall system should be specified on the <br /> plan. Minimum Class V riprap (6"to 30")is recommended. <br /> 5. Due to the extent of work proposed, it is recommended that a financial security of$5,000 for erosion <br /> control and engineering oversight be required of the Applicant. The financial security is intended to <br /> provide protection in the event that it becomes necessary for the City to install or maintain erosion <br /> and sediment control within the project area and covers the cost of vegetation re-establishment if the <br /> applicant is unable to follow through with the conditions of approval. <br /> 6. The applicant may be required to obtain Minnehaha Creek Watershed District(MCWD) approval <br /> and permitting for their Erosion Control, Shoreline and Streambank Stabilization, and Floodplain <br /> Alteration Rules. A copy of any approvals or permits required should be submitted prior to final <br /> approval. <br />