My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01353 - land alteration
Orono
>
Property Files
>
Street Address
>
H
>
Highwood Road
>
4195 Highwood Road - 07-117-23-44-0095
>
Permits/Inspections
>
2015-01353 - land alteration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:41:07 PM
Creation date
2/16/2017 2:36:24 PM
Metadata
Fields
Template:
x Address Old
House Number
4195
Street Name
Highwood
Street Type
Road
Address
4195 Highwood Rd
Document Type
Permits/Inspections
PIN
0711723440095
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• = BQLTON 8� M � N K , I NC� <br /> . ¢ Consulting Engineers & Surveyors <br /> �� 2638 Shadow Lane, Suite 200 •Chaska, MN 55318-1172 <br /> Phone(952)448-8838• Fax(952)448-8805 <br /> www.bolton-menk.com <br /> August 24, 2015 <br /> City of Orono RONO �Op� <br /> Attn: Melanie Curtis 0 <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> RE: CUP Application 15-3725 <br /> 4167 Highwood Road <br /> Engineering Review#2 <br /> Dear Melanie: <br /> As requested, we have completed an engineering review of the documents submitted for the above <br /> referenced project. We offer the following observations, comments, and recommendations for your <br /> consideration: <br /> 1. The Applicant is proposing to perform site grading of approximately 100 cubic yards and install <br /> riprap along the shoreline. If material is to be imported to the site, the City should consider the <br /> following: <br /> a. The City Engineer should be allowed to inspect any riprap or fill being imported to the site prior <br /> to it being placed. <br /> b. The Applicant should confirm with the City Engineer acceptable hours of truck hauling and <br /> provide documentation on the haul route to be used. Acceptable hours and haul route should be <br /> approved prior to the importing of any riprap or fill. <br /> c. The City Engineer should inspect roadways on haul route prior to and following completion of <br /> work to determine whether adverse impacts have occurred. The applicant should be responsible <br /> for the repair to roadways for any adverse impacts. <br /> 2. Perimeter erosion control measures should be installed by the Contractor and inspected by the City <br /> prior to any land disturbing activities. <br /> 3. Disturbed areas must be permanently stabilized within 7 days of completing grading and wall <br /> construction operations. The Green-Dale Design Plan should be revised to indicate locations and <br /> schedule for re-vegetation or a Landscape Plan should be submitted with the necessary information. <br /> 4. The size of rock to be used for stabilizing the base of the sub-wall system should be specified on the <br /> plan. Minimum Class V riprap (6"to 30")is recommended. <br /> 5. Due to the extent of work proposed, it is recommended that a financial security of$5,000 for erosion <br /> control and engineering oversight be required of the Applicant. The financial security is intended to <br /> provide protection in the event that it becomes necessary for the City to install or maintain erosion <br /> and sediment control within the project area and covers the cost of vegetation re-establishment if the <br /> applicant is unable to follow through with the conditions of approval. <br /> 6. The applicant may be required to obtain Minnehaha Creek Watershed District(MCWD) approval <br /> and permitting for their Erosion Control, Shoreline and Streambank Stabilization, and Floodplain <br /> Alteration Rules. A copy of any approvals or permits required should be submitted prior to final <br /> approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.