My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-00732 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
H
>
Highwood Road
>
4195 Highwood Road - 07-117-23-44-0095
>
Permits/Inspections
>
2011-00732 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:41:06 PM
Creation date
2/16/2017 2:35:16 PM
Metadata
Fields
Template:
x Address Old
House Number
4195
Street Name
Highwood
Street Type
Road
Address
4195 Highwood Rd
Document Type
Permits/Inspections
PIN
0711723440095
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3730 Shady Oak Road <br /> Minnetonka, MN 55305 <br /> phone(952) 933-3930 <br /> • • • Cell (612) 723-5248 <br /> CONSTRUCTION COMPANY Fax (952) 933�3033 <br /> Page 8 <br /> (6-2-11) <br /> 19. General <br /> a Supply a11 necessary permits. <br /> b. Coordinate a11 inspections. <br /> c. I have included a$1,200.00 allowance for engineering. <br /> (sizing of floor system,headers,roof supports.) <br /> d. Dumpsters ha.uling. <br /> e. Daily site clean up. <br /> Alternates <br /> 1. New shower—includes the following: <br /> a. Framing <br /> b. Plumbing—rough-in and finish(faucet allowance $350.00) <br /> c. Prep for tile. Dura-rock,rubber pan,poured floor. <br /> d. Tile—Tile allowance $5.00 per sq. ft. <br /> (This may need to be increased pending tile selctions.) <br /> e. Standard shower door plus glass panels to two additional azeas shower. <br /> 2. Angled e�cterior corners of 1 St floor study <br /> a. Pour footings and lay founda.tion block. <br /> b. Frame exterior walls—material and labor. <br /> c. Additional stone veneer. <br /> d. Insulation. <br /> e. Demo of stucco as necessary. <br /> 3. Sidewalk—extend new sidewalks from porch to driveway. This is azea from spilt <br /> in walks to driveway. Stamped concrete. <br /> 4. Driveway replacement <br /> a. Remove the existing driveway and base fill. <br /> b. Supply and insta114"of compacted fill to entire surface. <br /> c. Pour 4"concrete reinforced driveway of similar layout as existing. Pour to <br /> existing apron. <br /> 5. Solar Tubes <br /> a. Add one solaz tube(10")to each of the girls baths. <br /> b. Add one solar but(10"to the master suite hallway. <br /> 6. HVAC <br /> a. Upgrade equipment to a 97%efficient furnace and 16.0 seer a/c. <br /> b. Add additional ductwork to put entire 2°d floor on one zone. <br /> c. Provide and install Venmar HRV to basement furnace. <br /> d. Provide and install U1traAire DH90 whole house dehumidifier interlocked with <br /> main furnace. Provide and install Honeywell Vision Pro 9000 IAQ controller. <br />
The URL can be used to link to this page
Your browser does not support the video tag.