My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-00732 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
H
>
Highwood Road
>
4195 Highwood Road - 07-117-23-44-0095
>
Permits/Inspections
>
2011-00732 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:41:06 PM
Creation date
2/16/2017 2:35:16 PM
Metadata
Fields
Template:
x Address Old
House Number
4195
Street Name
Highwood
Street Type
Road
Address
4195 Highwood Rd
Document Type
Permits/Inspections
PIN
0711723440095
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ''� '�i i� 3730 Shady Oak Road <br /> Minnetonka, MN 55305 <br /> � � � Phone(952) 933-3930 <br /> Cell (612) 723-5248 <br /> CONSTRUCTION COMPANY Fax(952) 933�3033 <br /> Page 7 <br /> (6-2-11) <br /> 16. Decorating/Painting <br /> a. Prime and paint new exterior surfaces including the following: <br /> *Front columns <br /> *Soffit and fascia. <br /> *Porch ceiling. <br /> b. Prime and paint walls and ceilings—New azeas <br /> *Prime and paint ceilings. <br /> *Prime and apply(2)finish coats to walls. <br /> c. Millwork—window trim,doors and trim—finish a11 new windows,window <br /> trim,doors,door trim and frames as well as all new base trim. <br /> d. Refinish azeas affected by addition and remodeling. <br /> *Master bedroom wa11s and ceiling. <br /> *Master bedroom entry,hallway and new closet. <br /> *First floor wa11s and ceilings as necessary. <br /> e. Finish two windows in Northwest bedroom. Repaint two wa11s. <br /> 17. Misc. Items—supply and install the following: <br /> a. Mirrors(2). <br /> b. Towel bars—(4). <br /> c. Toilet paper dispensers(2). <br /> d. Shower rods(2). <br /> e.New door hardware- $50.00 allowance per door. Tota1(8). <br /> 18. Adjacent Space Remodeling—I have included a$3,500.00 allowance for first floor <br /> repairs and restoration due to the 2°d level additions and remodeling. <br /> Note: I have included this allowance to cover possible ceiling repairs due to new <br /> floor system as well as a possible new chase to expand heat or run new <br /> plumbing from the mechanical room to the 2°d floor. All or a portion of this <br /> maybe necessary. � <br />
The URL can be used to link to this page
Your browser does not support the video tag.