Laserfiche WebLink
�•r�.�ros,r.oF�e..�sou <br /> . <br /> Non-Level Pressure Distribution Design <br /> Minnesota Pollution WO�'�($heet <br /> Control A enc " �=�-� <br /> 10. Calculate Totat GPM for system-the total GPM need from the pump. �/O�U1112 Of L1C�Uld 1�1 <br /> Laterat 1 Ftow= 14•0 �Pe <br /> C�GPM <br /> Pipe Liquid <br /> Laterat 2 Flow= 14.0 GPM Diameter Per Foot <br /> (inches) (Gallons) <br /> Laterat 3 Ftow= �GPM <br /> 1 0.045 <br /> Lateral4 Ftow= �GPM 1.25 �.�7$ <br /> 1.5 0.110 <br /> Lateral 5 Ftow= �GPM 2 0.170 <br /> 3 Q.380 <br /> Totat Flow Z$'� GPM <br /> 4 0.661 <br /> 11. Summary <br /> Enter the minimum pipe size that atlows for even distribution and the volume of liquid in the pipe from the table. <br /> Pipe Volume Totat Votume to Fill Perforation <br /> Pipe Size(in) (gal/ft) Pipe Length (ft) Pipe(gal) Size(in) Spacing(ft) <br /> Laterall 1.5 0.110 36 3.96 1/4 Z•0 Highest <br /> Lateral2 1.5 0.110 36 3.96 1/4 3.3 <br /> Lateral 3 <br /> Lateral 4 <br /> Lateral 5 Lowest <br /> Total Votume of Distribution Piping= 7.9 <br /> Min. Delieved Dose Votume=Five X the Total Volume of Piping= 39.6 <br /> I hereby certify that 1 have compteted this work in accordance with all applicable ordinances, rutes and laws. <br /> Joseph J Olson 810 8/10/09 <br /> (Designer) (Signature) (License�) (Date) <br />