My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00577 - new septic
Orono
>
Property Files
>
Street Address
>
H
>
High Lane
>
3415 High Lane - 05-117-23-12-0017
>
Septic
>
2009-00577 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:16:10 PM
Creation date
1/26/2017 2:03:49 PM
Metadata
Fields
Template:
x Address Old
House Number
3415
Street Name
High
Street Type
Lane
Address
3415 High La
Document Type
Septic
PIN
0511723120017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o����r�sirr a•�ii..�rwr.. . <br /> � Non-Level Pressure Distribution Design - -_ <br /> ►►Ainnesota Pollution WOI"�CS�'1@@t -- <br /> Control A enc <br /> 9. Balance flows for other lateral lengths,spacing,and size. <br /> if you end up with large perforation spacing(3'is max)lower the initial spacing for Lateral 1 (Line 7.A)or the perforation size(Line 6) <br /> Lateral 2 GPM=Length of Lateral X Galtons Per Minute Per Foot (Line 8) <br /> 36 ft X Q,39 GPM/ft= �t}.Q GPM <br /> Number of Perforations=GPM/Ftow Rate for Lateral 2(Line 6.2) Check Table to ensure the maximum number of perforations is not <br /> exceeded. <br /> 14.� _ �.17 = 12 Perforations �l�Type of Manifold Connection(End or Center): <br /> �e�,d ❑c�,c� <br /> Spacing= (Length of Lateral)/(Number of Pertorations-1) <br /> ( 3(� ) : ( 12 Perforations-�) = 3,3 ft <br /> Lateral 3 GPM=Length of Lateral X Galtons Per Minute Per Foot (Line 8) <br /> � ft X �.39 GPM/Ft= �GPM <br /> Number of Perforations=GPM/Ftow Rate for Lateral 2(Line 6.3) Check Table to ensure the maximum number of perforations is not <br /> exceeded. <br /> � � � �Perforations Select Type of Manifold Connection (End or Center): <br /> ❑end ❑ce�,cer <br /> Spacing=(Length of Lateral)/(Number of Perforations-1) <br /> (� � : ( � Perforations-1) _ �ft <br /> Lateral 4 GPM=Length of Lateral X Gallons Per Minute Per Foot (Line 8) <br /> � ft X 0.39 GPM/Ft= �GPM <br /> Number of Perforations=GPM/Flow Rate for Laterat 2(Line 6.4) Check Tabte to ensure the maximum number of perforations is not <br /> exceeded. <br /> � � �Perforations Setect Type of Manifotd Connection (End or Center): <br /> l�l <br /> Spacing=(Length of Laterat)/(Number of Perforations-1) �E� ❑�� <br /> (� � � ( � Perforations-1) _ �ft <br /> Lateral 5 GPM=Length of Lateral X Gatlons Per Minute Per Foot(Line 8) <br /> � ft X �.39 GPM/Ft= �GPM <br /> Number of Perforations=GPM/Flow Rate for Lateral 2(Line 6.5) Check Table to ensure the maximum number of perforations is not <br /> exceeded. <br /> � � �Perforations Select Type of Manifold Connection (End or Center): <br /> ❑e�d ❑c�c� <br /> Spacing=(Length of Lateral)/(Number of Perforations-1) <br /> (� ) = ( � Pertorations-1) _ �ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.