My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00577 - new septic
Orono
>
Property Files
>
Street Address
>
H
>
High Lane
>
3415 High Lane - 05-117-23-12-0017
>
Septic
>
2009-00577 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:16:10 PM
Creation date
1/26/2017 2:03:49 PM
Metadata
Fields
Template:
x Address Old
House Number
3415
Street Name
High
Street Type
Lane
Address
3415 High La
Document Type
Septic
PIN
0511723120017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.,.�A,R,�>�,..F�,� <br /> . Pump Selection Design <br /> Minnesota Pollutian Worksheet �:,������ . <br /> Controi A enc <br /> 1. PUMP CAPACITY <br /> 1. Pumping to Gravity Distribution <br /> A. Minimum dixharge is 10 GPM(15 GPM recommended) ��GPM <br /> B. Maximum discharge is 45 GPM <br /> 2. Pressure Distribution <br /> 0 Individual SSfS �Collection Syslem <br /> Required Flow Rate (Line 11 of Pressure Distributio�or Line 10 of Non-Leve() 28,0 GPM <br /> C. Distribution to: ❑Soil Treatment Unit ❑Media Filter ❑ATU ❑Other <br /> 2. HEAD REQUIREMENTS <br /> oi treatment rysrem <br /> 3. Elevation Difference �ft &point ot dis<haryc <br /> � , � , <br /> between pump and point of discharge: <br /> ��y����!`�=.,.� <br /> .��-""� _ <br /> NOTE:IF rystem is an individual subwrface sewage treotment niet pipe m ''�� Ekvation%�' <br /> rystem,comp(ete steps 4-9. !f rystem is a Co(lection System, __ _ I d+rre��ce <br /> skip steps 4,5, 7 and 8 and go to Step 10. <br /> �,,-, - ---------------------------- -------------- <br /> 4. Distribution Head Loss I ��ft � � .. ,� <br /> L- <br /> 5. Additional Head Loss: ��ft(due to speciat equipment,etc.) <br /> Distribution t�ead l,oss Fnctan Loss�n P ast�c P�pe per 100 <br /> Gravity DistribUtion = Oft C=13U <br /> Pressure Distribution based on Minimum Average Head ��nal Plpe DidrTteter' <br /> Value on Pressure Distribution Worksheet: F GPM te 1 1'/i 13�z 2 3 <br /> Minimum Avera e Head Distribution Head Loss �p 9.11 3.08 1.27 0.31 --- <br /> 1ft 5ft <br /> 2ft 6ft �2 12.77 4.31 1.78 0.44 --- <br /> 5ft �oft 14 16.99 5.7d 2.36 0.58 --- <br /> 16 --- 7.35 3.03 0.75 0.10 <br /> 6. A. Supply Pipe Diameter: 2,0� �� 18 --- 9.14 3.76 0.93 0.13 <br /> B.Supply Pipe Length: 30 ft 20 =_= 11.11 4.58 1.13 0.16 <br /> 25 16.79 6.92 1.71 0.24 <br /> 7. Based on Friction Loss in Plastic Pipe per 100ft from Table I: 30 --- --- 9.69 2.39 0.33 <br /> 35 --- --- 12.90 3.18 0.44 <br /> Friction Loss= 2.09 ft per t00ft of pipe 40 --- --- 16.52 4.07 0.57 <br /> 45 --- --- --- 5.07 0.70 <br /> g, Determine Equivatent Pipe length from pump discharge to soil dispersal �0 --- - --- 6.16 0.86 <br /> area discharge point. Estimate by adding 25%to supply pipe tength for <br /> fitting loss. Supply Pipe Length(5.8) X 1.25=Equivalent Pipe Length 55 --- --- --- 7.35 1.02 <br /> b0 --- -- -- 8.63 1.20 <br /> 30 ft X 1_25 = 37.�j ft 65 --- --- --- 10.01 1.39 <br /> 70 --- --- --- 11.48 1.60 <br /> 9. Calculate Supp(y Friction Loss by multiplying Friction Loss Per 100ft (Line 6)by the Equiva(ent Pipe Len3th (Line 7)and divide by 100. <br /> Supply Fridion Loss= <br /> 2.09 rt���oofc x 37.5 ft r ioo = 0.8 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.