My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2014 Council Packet
Orono
>
City Council
>
2014
>
01-27-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:55 PM
Creation date
4/6/2015 1:13:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Moline Toro-Standpipe Rehabilitation and Recoating(2.1 MG)and Blake <br /> Double Ellipsoidal Rehabilitation and Recoating(500,000 gallon)— <br /> Hopkins <br /> • Water Tower Reconditioning—Isle <br /> • Tank Reconditioning, Design Build(1.5 MG)—Lakeville <br /> • Reconditioning Tank No. 2 (1 MG)—Lino Lakes <br /> • Double Ellipsoidal Tank(250,000 gallon)—Camp Ripley, Little Falls <br /> (Minnesota Army National Guard) <br /> • Balcerzak Toropillar(1.5 MG)—Mankato <br /> • Tonkawood(500,000 gallon) and Woodland Hills (1 MG)Elevated Water <br /> Towers—Minnetonka <br /> • Double Ellipsoidal (500,000 gallon)—New Hope <br /> • Ground Storage Reservoir(300,000 gallon)—Paynesville <br /> • Standpipe Reconditioning(1 MG)—Plyinouth <br /> • Double Ellipsoidal (150,000 gallon)—Sandstone <br /> • Tank Rehabilitation(750,000 gallon)—Sauk Rapids <br /> • St. Joseph Tower Hydropillar(l.5 MG)—St. Cloud <br /> • Watersphere(150,000 gallon)—University of Minnesota, St.Paul <br /> Campus <br /> • Water Tank Reconditioning—South St. Paul <br /> � • Commerce Court Tank Rehabilitation(1 MG)—Vadnais Heights <br /> • Hydropillar(1 MG)—Vadnais Heights <br /> • Tank Reconditioning(500,000 gallon)—Waite Park <br /> • Elevated Water Storage Tank(50,000 gallon)—Waverly <br /> � • Double Ellipsoidal Water Storage Tank Rehabilitarion(500,000 gallon)— <br /> W ayzata <br /> Wisconsin <br /> • Tank Reconditioning(500,000 gallon)—Altoona <br /> • Ground Storage Reservoir Recondirioning,Design-Build—Berlin <br /> • Pedisphere(250,000 gallon)—Black River Falls <br /> ' • Standpipe Reconditioning, Design-Build—Chetek <br /> • Pedestal Reconditioning, Design-Build—Eagle River <br /> • Ground Reservoir(3 MG)—Eau Claire <br /> • Waterspheroid(150,000 gallon)—Grantsburg <br /> ' • Wisconsin Street Elevated Tank(150,000 gallon)—Hudson <br /> • Ground Storage Tank(1 MG)—Hudson <br /> • Ground Storage Reservoir(750,000 gallon)—Mondovi <br /> • Tank Reconditioning(250,000 gallon)—Monona <br /> • Elevated Tank(250,000 gallon)—New Richmond <br /> Tank Reconditioning(400,000 gallon)—City of Anoka, Minn. Project <br /> Manager on a 400,000 gallon tank reconditioning. Dan was responsible for <br /> development of plans and specifications, construction administration, and <br /> coordination of inspection services. This project provided a case study, <br /> evaluating standard interior two-coat epoxy, epoxy zinc, and single-coat zinc <br /> systems in service as part of a complete tank reconditioning.Recipient of an <br /> Honor Award, 2006 Engineering Excellence Award—Special Projects <br /> Category, Consulting Engineers Council of Minnesota. <br /> / <br /> 1 <br /> SEH Daniel J.Zienty, NACE CIP,SSPC PCS � Associate�Senior Project Design Leader � <br /> page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.