My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2014 Council Packet
Orono
>
City Council
>
2014
>
01-27-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:55 PM
Creation date
4/6/2015 1:13:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract Deliverables <br /> In addition to providing the owner with a rehabilitated tank and a <br /> newly applied coating system, SEH D�B will pro��ide an annual report <br /> summarizing the performance of the tank's coating system. <br /> Project Inspections and Report Documentation <br /> All work will be regularly inspected by our NACE-certified, tank <br /> inspection professionals. All inspections will be thoroughly <br /> documented in a multi-page report that will include: <br /> • A summary of the work performed to-clate <br /> • Listing of SEH D�B personnel and equipment presently on site <br /> • Site conditions requiring input from the Owner <br /> • Field work testing or sampling performed <br /> • Extensive photographs of the work at the time of the inspection <br /> Our project inspectors will make frequent visits to the site during the <br /> major rehabilitation work in 2014. <br /> SEH D�B strongly believes these inspections are critical for several <br /> reasons: <br /> • Communicating project issues with the City before scheduling, cost <br /> issues or other problems arise <br /> • Documenting current project status to City staff for reporting to City <br /> leaders and residents <br /> • Ensuring and documenting the quality of the work that is <br /> performed for the City. <br /> • Record that all site and project safety procedures are being followed <br /> and a listing of any injuries that have occurred. <br /> Samples of recently completed tank maintenance inspection reports <br /> for SEH D�B projects are available for your review at your request. <br /> contract deliverables � page I 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.