My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2014 Council Packet
Orono
>
City Council
>
2014
>
01-27-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:55 PM
Creation date
4/6/2015 1:13:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. I• Mr. Jesse Struve, PE <br /> . � January 6, 2014 <br /> Page 2 <br /> The work is completed per the contractor's maintenance agreement, and many times does not specifically <br /> identify details of the work to be performed(structural details, specific paint products, coating thickness, <br /> etc.). Once the wark is completed per the agreement, payments are made annually as scheduled until the <br /> contract term expires. <br /> Work is scheduled by the contractor and coordinated through the owner, but the owner's specific schedule <br /> may not be followed if it is not defined in the term of the agreement. <br /> The extended maintenance agreement provides a quality of work guarantee and can be issued in any <br /> number of scheduled terms. Five(5) and 10 (ten)year maintenance agreements are fairly common. <br /> Normally spot coating repairs, which may or may not be required, are completed every five years. <br /> Design-Bid-Build (DBB) <br /> This is the traditional program of awarding construction/reconstruction contracts. In DBB, an engineer <br /> assembles bidding documents that are publicly advertised and awarded to the lowest qualified bid. <br /> Typically, minimum qualifications are required based on the size of the project and the number of similar <br /> projects done in the past. <br /> While less common, Quality Based Selection(QBS) can also be used to award the contract to a contractor <br /> based on predetermined formula for award which can include history, safety record, quality of work, etc. <br /> An example of using QBS is the City of Eagan where a previous tank rehabilitation contract was awarded <br /> by QBS. <br /> Once the award is made to a contractor, a predetermined schedule is followed to complete the work. The <br /> engineer provides construction observation and testing(such as environmental controls, surface <br /> preparation, dry film thickness and holiday testing)to ensure that the specifications for the work are met. <br /> Once the project is completed, the contractor is paid per the contract. Tank repairs are made prior to the <br /> expiration of a warranty term, commonly one or two years. However, extended warranties(5 years, 10 <br /> years, etc.) can be included in bidding documents. <br /> Benefits-Drawbacks of Desi�n Build <br /> Benefits <br /> • Direct selection of contractor <br /> • Hands off approach by owner. Contractor coordinates any work required. <br /> • Tower meets minimum industry standards for term of contract. <br /> • Known schedule of payments <br /> Drawbacks <br /> • None or less competitive bidding resulting in higher compared cost(Example: SEH <br /> D�B - $466,700 for 5 Year Term; $548,800 for 10 Year Term) <br /> • Additional work that may not be needed is included in contract <br /> • Minimum inspection oversight <br /> • No engineer to represent owner with technical issues <br /> G:\Orono\010614 struvememo.dotx <br /> You created this PDF from an application that is not licensed to print to novaPDF printer(http://www.novapdf.com) <br />
The URL can be used to link to this page
Your browser does not support the video tag.