My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2014 Council Packet
Orono
>
City Council
>
2014
>
01-27-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:55 PM
Creation date
4/6/2015 1:13:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G�X�-��ZT- C.�- <br /> • = BO LTON 8� M � N K , I N C� <br /> . Consuiting Engineers & Surveyors <br /> " 2035 County Road D East• Suite B• Maplewood, MN 55109-5314 <br /> Phone(651)704-9970• Fax(651)704-9971 <br /> www.bolton-menk.com <br /> MEMORANDUM <br /> Date: January 6, 2014 <br /> To: Jesse Struve, PE - Orono Public Works Director <br /> From: Douglas Klamerus, PE <br /> CC: Dave Martini, PE; Seth Peterson, PE <br /> Project: North Water Tower Rehabilitation <br /> Re: Alternative Rehabilitation Options <br /> Background <br /> In 2014,the City of Orono is planning for the rehabilitation of the North Water Tower. The existing <br /> tower is a 0.4 MG fluted column tank constructed by Pittsburg-Des Moines in 1992. The existing <br /> coatings are original to the tank. Based on an evaluation conducted by SEH in December 2012,the <br /> following items should be included in the rehabilitation scheduled for 2014: <br /> • Interior Wet Coatings: Complete removal and replacement of the interior wet coating system. <br /> Caulk the roof beams and seams as required. <br /> • Interior Dry Coatings: Spot repair areas of corrosion with either abrasive blasting or power tool <br /> cleaning. Completely remove the coatings on the access tube and bottom of the bowl and replace <br /> with a coating system similar to the interior wet. As shown by the amount of corrosion present in <br /> these two areas, these specific areas are fairly corrosive due to high levels of condensation and <br /> can benefit from a higher level of protection. <br /> • Exterior Coating: Spot repair any areas of corrosion or coatings failures with power tool cleaning <br /> to SSPGSP3 condition. After spot repairs and surface preparation, apply an overcoat system <br /> comprised of one epoxy and one polyurethane coating system. <br /> • New overflow discharge screen <br /> • New frost free vent <br /> • New double LED obstruction light <br /> • Replace logo <br /> There are two common approaches to tower rehabilitation which are outlined below: <br /> Design-Build <br /> With a design-build approach, the owner directly selects a contractor to complete an agreed upon scope of <br /> work for a predetermined fee. Selection is primarily made based on quality of service as the traditional <br /> low bid process is avoided. <br /> The typical owner-engineer-contractor process is also avoided since the engineer in the design-build <br /> method is no longer an independent party, but rather teamed with the contractor. Typically, there is less <br /> inspection oversight in this arrangement since the contractor's workforce performs their own quality <br /> control testing. <br /> G'\Orono\010614 struvememo.dota <br /> DESIGNING FOR A BETTER TOMORROW <br /> Bolton&Menk is an equal opportunity employer <br /> You created this PDF from an application that is not licensed to print to novaPDF printer(http://www.novapdf.com) <br />
The URL can be used to link to this page
Your browser does not support the video tag.