My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2014 Council Packet
Orono
>
City Council
>
2014
>
01-13-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:19 PM
Creation date
4/3/2015 12:46:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 3 <br /> PROPOSED SA1vITARY SEWER EXTENSION <br /> A. ALTERNATE 1 -FORCEMAIN <br /> Alternate 1 proposed extension of a 2-inch diameter forcemain from the gravity sewer <br /> on Shoreline Drive within Green Trees Road and north of the cul-de-sac to the most <br /> northerly lot. Figure 1 in the Appendix shows the proposed plan. This forcemain would <br /> allow each lot to pump raw sewage into the municipal sewer system and would allow <br /> eliminating the current sepric tanks and c3rain fields. Each lot would need a private <br /> grinder pump station to provide the pumping. Grinder pumps cut up the solids to allow <br /> raw sewage to be pumped through the 2-inch forcemain. The lots with existing pump <br /> stations likely are effluent pumps that pump relatively solids-free effluent from the <br /> septic tanks. These effluent pumps would need to be replaced with grinder pumps. The <br /> septic tanks would need to be pumped out and abandoned by filling with sand. <br /> The forcemain is proposed to be constructed by direction drilling, a trenchless <br /> construction method. The drilling would be done from the forcemain angle point in <br /> front of House No. 1485 which will require excavation for access. Excavations will <br /> also be required at both ends and also for the installation of the forcemain stubs to each <br /> lot. The service stubs can be located to facilitate connections to each house and to <br /> minimize disruption of surface improvements and landscaping. The forcemain will be <br /> 7.5' deep to protect it from freezing. Restoration of all disturbed surface areas is <br /> included in the project. <br /> The final plat dedicated utility and drainage easements to the City of Orono over the <br /> street outlot, plus 10 feet on each side of the outlot and also 5 feet on each side of the <br /> property lines. The proposed forcemain is within the street outlot up to the cul-de-sac. <br /> A new 20 foot wide permanent easement is required north of the cul-de-sac as shown <br /> on Figure 1. The easement is shown along driveways as much as possible. The <br /> forcemain curves shown on the plan are the minimum radius curves possible with <br /> directional drilling which limits the flexibility in the forcemain route. <br /> The extension of sewer service requires analysis to determine if existing facilities have <br /> adequate capacity to accommodate the increased flow. The critical component of the <br /> existing system is Grinder Station 9. This station has two grinder pumps each with a <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.