My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2014 Council Packet
Orono
>
City Council
>
2014
>
01-13-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:19 PM
Creation date
4/3/2015 12:46:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rated capacity of 39 gallons per minute (gpm). Drawdown testing performed on the <br /> station on August 8, 2013 indicated the two pumps have capacities of 26 gpm and 46 <br /> gpm. The average sewage generation rate used by MCES is 274 gallons per day (gpd) <br /> for single family homes. Grinder Station 9 currently serves 9 homes and adding the 6 <br /> homes served by the proposed extension yields a total of 15 homes. Based on MCES <br /> criteria, the total daily volume of sewer flow would be 5206 gpd or 3.6 gpm. This <br /> would require the pumps to run an average about 2.4 hours per day. Sewer flow varies <br /> throughout the day and MCES criteria assumes the peak flow rate to be 4 times the <br /> average flow or 14.4 gpm. This is well below the pump capacities, however this does <br /> not include infiltration and inflow (I/I) into the system which also needs to be pumped. <br /> Review of the weekly pump run meter data for 2012 and 2013 indicated that the peak <br /> week pump run time, which occurred in June 2013, was 57.8 hours, or an average af <br /> 8.3 hours per day. The peak day during this week would have been higher than the <br /> daily average for the week. The added flow from the 6 homes on Green Trees Road <br /> would require an average pump run time of 0.8 hours per day and therefore the <br /> extension is not expected to significantly increase the peak flow to Grinder Station 9 <br /> and the station has adequate capacity for the additional units. <br /> B. ALTERNATE 2- GRAVITY SEWER <br /> Review of the estimated basement floor elevations of the Green Trees Road homes <br /> indicates that a gravity sewer could be extended at elevations low enough to provide <br /> gravity sewer service to each lot which is typical for most service connections. This <br /> would eliminate the need for a grinder pump station on each lot. The gravity main <br /> would be 8-inch diameter which is the minimum size for municipal gravity sewer. The <br /> proposed sewer is shown on Figure 2 in the Appendix. The existing onsite systems <br /> would be abandoned, the same as with Alternate 1. <br /> A portion of the gravity sewer will need to be constructed at the minimum slope which <br /> is about 5 inches drop in 100 feet. The sewer can be constructed by trenchless method <br /> but the methods differ from the directional drilling for the forcemain due to the flat <br /> slope. The method proposed is described as guided boring which uses a laser to <br /> precisely guide the boring. This does not allow for curves in the sewer route and <br /> therefore the route shown on Figure 2 is straight lines from manhole to manhole. The <br /> boring would be done from the center manhole which will require a 15 foot diameter <br /> access shaft. The sewer depth at this location is about 19 feet. An access shaft about 14 <br /> feet deep will also be required at the north end to receive the boring equipment and <br /> construct a manhole. The gravity sewer service stubs will be constructed by open cut <br /> Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.