Laserfiche WebLink
Jessica Loftus <br />Orono North Well Project <br />June 21, 2016 <br />Page 2 <br /> <br /> <br /> <br /> BIDDERS <br />We <br />l <br />l <br /> <br />C <br />o <br />n <br />s <br />t <br />r <br />u <br />c <br />t <br />i <br />o <br />n <br /> <br />T <br />o <br />t <br />a <br />l <br /> (W <br />C <br />) <br /> <br />(U <br />n <br />i <br />t <br /> <br />P <br />r <br />i <br />c <br />e <br /> <br />B <br />i <br />d <br /> <br />Sc <br />h <br />e <br />d <br />u <br />l <br />e <br /> <br />T <br />o <br />t <br />a <br />l <br />s <br />) <br /> <br />No <br />n <br />-We <br />l <br />l <br /> <br />C <br />o <br />n <br />s <br />t <br />r <br />u <br />c <br />t <br />i <br />o <br />n <br /> <br />Co <br />s <br />t <br />s <br /> <br />( <br />N <br />W <br />) <br /> <br />(L <br />u <br />m <br />p <br /> <br />S <br />u <br />m <br /> <br />I <br />n <br />c <br />l <br />u <br />d <br />i <br />n <br />g <br /> <br />$3 <br />0 <br />k <br /> <br />Al <br />l <br />o <br />w <br />a <br />n <br />c <br />e <br />) <br /> <br /> <br />To <br />t <br />a <br />l <br /> <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br /> <br />Bi <br />d <br /> <br />(WC <br /> <br />+ <br /> <br />N <br />W <br />) <br /> En <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br /> <br />O <br />b <br />s <br />e <br />r <br />v <br />a <br />t <br />i <br />o <br />n <br /> Co <br />s <br />t <br />s <br /> <br />( <br />E <br />O <br />) <br /> <br /> <br />We <br />l <br />l <br /> <br />C <br />o <br />n <br />s <br />t <br />r <br />u <br />c <br />t <br />i <br />o <br />n <br /> <br />M <br />e <br />t <br />h <br />o <br />d <br /> <br />Ca <br />b <br />l <br />e <br /> <br />T <br />o <br />o <br />l <br /> <br />( <br />C <br />T <br />) <br /> <br /> <br />Du <br />a <br />l <br /> <br />R <br />o <br />t <br />a <br />r <br />y <br /> <br />( <br />D <br />R <br />) <br /> <br /> <br />Pr <br />o <br />j <br />e <br />c <br />t <br /> <br />Ev <br />a <br />l <br />u <br />a <br />t <br />i <br />o <br />n <br /> <br />C <br />o <br />s <br />t <br /> <br />(WC <br /> <br />+ <br /> <br />N <br />W <br /> <br />+ <br /> <br />E <br />O <br />) <br /> <br /> <br />1. Mark J. Traut Wells $377,897 $178,571 $556,468 $30,857 (DR) $587,325 <br />2. E.H. Renner $378,510 $170,000 $548,510 $69,428 (CT) $617,938 <br /> <br />ARTICLE 19.06, “EVALUATION OF BIDS AND AWARD OF CONTRACT”, of Section 00200, <br />“INSTRUCTIONS TO BIDDERS”, prescribes that: “If the Contract is to be awarded, Owner will award <br />Contract to the Bidder whose Bid is in the best interests of the Project. The evaluation will include <br />assessment of engineering observation costs at 12 hours per week by the Engineer.” The project duration <br />for each drilling method was called in the bidding documents (DR – 120 days, CT – 270 days). <br /> <br /> <br />Per the prescribed bid evaluation, we recommend that the contract be awarded to Mark J. Traut for the <br />contract amount of $556,468. <br /> <br />Sincerely, <br /> <br />BOLTON & MENK, INC. <br /> Steve Nelson, P.E. <br />Project Manager <br /> <br /> <br />H:\ORNO\C13111233\6_Plans-Specs\B_Bid Tabulation\Bid Evaluation Letter C13.111233.doc