My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-2014 Council Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
2010-2019
>
2014
>
09-08-2014 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2015 2:32:58 PM
Creation date
3/5/2015 2:32:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, September 8, 2014 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br /> Page 2 of 25 <br />(4. DRAFT PAVEMENT MANAGEMENT PLAN, Continued) <br /> <br />Martini noted over the years the City’s maintenance operations have included crack sealing and seal <br />coating. In general it has been the City’s practice to extend the coverage of the road budget by limiting <br />the scope of work to the extent possible. Consistent with past practices, the updated pavement <br />management plan attempted to look at seal coating and more maintenance type activities. Martini noted <br />from a rehabilitation treatment standpoint, the assumption is that as the project starts to move forward or a <br />particular road is being considered, a feasibility study would be completed. <br /> <br />Martini noted the City has had some roads in the past where reclamation has been included as a feasible <br />method for rehabilitation. Martini stated the plan has considered the following rehabilitation methods: <br />seal coating and crack filling, mill and overlay, and reconstruction. The assumption was that a road with <br />a PCI of 75 or greater would be improved with seal coating and crack sealing, a road between 60 and 75 <br />would be a candidate for mill and overlay, and then a PCI less than 60 would be considered a road that <br />would be reconstructed. Martini noted the plan does not specifically identify any roads for reclamation <br />other than Watertown Road and Stubbs Bay Road where a feasibility study has already been completed. <br />It is recommended in the plan that one of the options to be considered in the feasibility study would be <br />reconstruction. <br /> <br />Martini stated potential funding sources for road improvements include the pavement management fund, <br />municipal state aid fund, the general fund/debt service transfers, franchise fees and special assessments. <br />Martini noted the franchise fee is an alternate source of revenue that is traditionally used towards the <br />City’s improvement projects. <br /> <br />Martini stated the low volume roads identified in the plan amount to a little over $4 million worth of <br />work, the collector roads amount to approximately $4.5 million, and the municipal state aid system <br />amounts to approximately $3.1 million, for a total of $12.3 million. Martini noted that the costs provided <br />in the report are all 2014 dollars and no effort has been made to project inflation. Because of the shift in <br />the methodology of working within the footprint of the existing roadway, the previous plan had identified <br />over $20 million worth of improvements, which has been scaled down significantly in the updated plan. <br /> <br />Martini noted the plan is intended to be an average and some projects may require a bigger scope than <br />what has been presented in the plan but the hope is that there will be other projects, based on existing <br />conditions, those projects can be scaled back, especially on the lower volume roads. <br /> <br />Martini stated when you break it down by rehabilitation type, seal coating and cracked sealing amounts to <br />approximately $250,000 per year if it is divided by seven years. Martini noted the maximum life of a seal <br />coating is seven years. The plan identifies approximately 30 miles of road that are in that seal coat <br />category, which breaks out to approximately $59,000 a mile. Mill and overlay breaks down to <br />approximately $324,000 a mile and covers nine miles of road. The reconstruction comes in at <br />approximately $729,000 per year over a 10-year period. The total investment, if the City were to follow <br />the plan, would break down to an average of $1.3 million per year. <br /> <br />Levang stated she is happy to see the reduction from $20 million to $14 million and that she also <br />appreciates the pictures of the roads that have been included in the report. Levang stated in her view it <br />behooves everyone to remember that maintenance does extend the life of the road and that the seal <br />coating and crack sealing are important things to be doing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.