Laserfiche WebLink
DIVISION 9 - FINISHES <br /> A Gypsum Drywall <br /> 1 . 5/8" single layer drywall used throughout, installed with wood screws. All walls to <br /> be taped and sanded smooth, ready for paint. Ceilings to be smooth, ready for <br /> paint. <br /> 2. Water resistant sheetrock to be used at tub and shower surrounds. <br /> B. Tile <br /> 1 . To be selected. Floor tile material and installation allowance to be $9.00 per <br /> square foot. Wall tile in tub and shower surrounds material and installation <br /> allowance to be $4.50 per square foot. <br /> C. Carpet <br /> 1 . To be selected. Allowance for carpet areas to be$22.00 per square yard, <br /> including material and installation. <br /> D. Painting. All finishes exterior and interior shall match the existing finishes. The <br /> following information shall be used as a guide only. <br /> 1. Exterior siding to have one coat solid color stain, Cabot or equal. Trim boards and <br /> brick mould to have 2 coats. <br /> 2. All interior woodwork to be carefully cleaned, sanded and puttied. Finish to be <br /> stained, sealed, hand sanded and varnished or enameled. Main level enamel. <br /> Lower level stain. <br /> 3. Interior walis to be painted with two coats flat latex, Benjamin Moore or equal, or <br /> sized to accept wall paper. Choice of standard color. One color throughout. <br /> 4. The existing fireplace mantle in the Living Room shall be painted a white enamel. <br /> E. Wall covering. <br /> 1. Replace the existing wall covering in the master bath. Allowance to be $750.00. <br /> DIVISION 10 - SPECIALTIES <br /> A. Toilet and Bath accessories to be selected. Allowance to be $400.00. <br /> B. Zero clearance fireplace to be selected. Allowance shall be $2,500.00. <br /> DIVISION 11 - EQUIPMENT <br /> Not Used <br /> DIVISION 12 - FURNISHINGS <br /> A. Cabinets/Countertops/Vanities - Design and style shall match the existing. <br /> DIVISION 13 - SPECIAL CONSTRUCTION <br /> Not Used <br />