My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-004226 - 2nd story addition
Orono
>
Property Files
>
Street Address
>
F
>
French Creek Drive
>
1380 French Creek Drive - 10-117-23-32-0009
>
Permits/Inspections
>
1992-004226 - 2nd story addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:25:35 PM
Creation date
12/6/2016 1:05:21 PM
Metadata
Fields
Template:
x Address Old
House Number
1380
Street Name
French Creek
Street Type
Drive
Address
1380 French Creek Drive
Document Type
Permits/Inspections
PIN
1011723320009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
View images
View plain text
DIVISION 14 - CONVEYING SYSTEMS <br /> Not Used <br /> DIVISION 15 - MECHANICAL <br /> A. Plumbing contractor shall provide all labor and material and perform all plumbing work <br /> for a complete job. All plumbing shall be properly installed and all connections tested <br /> and instalied according to code. Water and sewer connections shall be made with <br /> private well and septic system. <br /> 1 . Water lines to be copper. Waste and vent lines to be PVC. <br /> 2. All tubs, faucets and toilets to be Kohler. Plumbing fixtures to be as follows: <br /> ROOM or <br /> BATH# MAKE/MODEL COLOR FITTINGS -MAKE/MODEL <br /> Tub K505 Standard Brass Flair Series <br /> Toilet K3520EB Standard Brass Handle <br /> Shower <br /> Controls Coralais Brass Mixing valve <br /> Persona Brass Adjustable shower head <br /> Sinks Integral Corian Standard 8"center brass 2 handle valve, 2 <br /> handle. Flair series. <br /> B. One additional water heater to be 75 gallon natural gas, Rheem or equal. Two <br /> additional outside sillcocks shall be provided. <br /> C. HVAC <br /> 1 . Heating contractor shall provide all necessary labor and material and perform all <br /> heating work required for a complete job in the installation of the system as per <br /> current code. The system shall include the foilowing for bidding purposes. <br /> a. Furnace: Lennox 90%, (75,000 BTU) , or equal. <br /> b. Air Conditioner: Lennox 2 Ton, or equal. <br /> c. Power humidifier: Aprilaire Model 440 <br /> d. Air Cleaner: Honeywell Electronic Air cleaner. Provide an additional air <br /> cleaner for the existing furnace. <br /> D. Chimney(s) to be class B metal. <br /> E. Supply air ductwork in lower level to be PVC under concrete. <br /> F. Venting for dryer, kitchen cook-top, bath fans. <br /> G. Natural gas piping as required to furnaces, future grille on deck, water heater. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).