Laserfiche WebLink
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, May 29, 2012 <br />7:00 o'clock p.m. <br />(7. PLANNING COMMISSIONAPPLICATIONS, Continued) <br />Printup noted there are two alternate positions available and that he would recommend offering an <br />alternate position to Tom Frahm. <br />Franchot amended his motion, Bremer seconded, to appoint Bruce Lemke as regular planning <br />commissioner and to appoint Chris McGrann and Tom Frahn, if interested, as alternates. VOTE: <br />Ayes 4, Nays 0. <br />PUBLIC WORKS DIRECTOR/CITY ENGINEER'S REPORT <br />8. - ORONO ORCHARD ROAD PROJECT — BID AWARD <br />Struve stated at the April 9, 2012, meeting, the City Council was presented with plans and specifications <br />for the Orono Orchard Road project;and gave authorization for bidding the project. Bids were opened on <br />May 11, 2012. The low bidder is Minger Construction, Inc., in the amount of $2,957,685, which is <br />approximately 5.8 percent lower than the estimated project cost of $3,139,047 as presented in the <br />feasibility report. <br />This is a Cooperative Agreement project with the Metropolitan Council Environmental Services. MCES <br />• has reviewed the bids and are in agreement with the updated, but still estimated, project cost splits. As <br />per the Cooperative Agreement, the final project costs will be reimbursed based on actual project <br />numbers. This places MCES's city project cost participation rate at 24.5 percent. <br />The total for city road and utility improvements is $936,537. After including the 20 percent for <br />engineering costs and 5 percent for bonding, the total estimated City contribution is $1,180,037. This is <br />approximately 3.7 percent lower than the estimated $1,226,000 project costs as presented to the City <br />Council on April 9, 2012. <br />McMillan noted that approximately $1 million of the costs for this project is allocated for the sewer <br />portion of the project, which will be picked up by the Metropolitan Council. <br />Printup moved, Franchot seconded, to award the bid for the Orono Orchard Road project contract <br />to Minger Construction, Inc., in the amount of $2,957,685. VOTE: Ayes 4, Nays 0. <br />9. PUBLIC HEARING — ANNUAL PUBLIC HEARING FOR NPDES PHASE II STORM <br />WATER PERMIT <br />Struve noted the City of Orono holds an MS4 (Municipal Separate Storm Sewer System) permit under the <br />NPDES program for operation of the City's stormwater drainage system. The NPDES is a national <br />regulatory program under the jurisdiction of the U.S. Environmental Protection Agency and is <br />administered at the state level by the Minnesota Pollution Control Agency. <br />A requirement of the permit is that an annual report be prepared and submitted to the MPCA. Staff has <br />• prepared the report and will submit to the MPCA at the completion of this meeting. One component of <br />the report is that the City must hold a public meeting. The meeting must provide a summary of the City's <br />Storm Water Pollution Prevention Program, the activities of the City for the past calendar year in regards <br />to the permit requirements, and must afford the opportunity for public input and comment. <br />Page 5 of 10 <br />