Laserfiche WebLink
JUL. !. "lUU6 11 :45A�I URN�tKnY �umrHNY ivu, 4y I r. � � <br /> 7/7/06 <br /> Dear Orono City Planning Commission, � <br /> , Below is a olarification of my variance request that was tabled from . <br /> last month. I feel this is necessary as fihe staff report �ha� Was written <br /> up for your review was done by staff that was nofi present at our pre <br /> application mee�ing. My buiider and architect have tried for 2 weeks with <br /> no success to meet wi�h Mike Gafron. They have had 2 meetings with <br /> Evelyn since our last pre planning mee�ing fhat was attended by Melany. <br /> Several things Were le�t oufi or nofi presented properly, We were only <br /> given the staff recommendations �he day of the planning meetit�g- tihese <br /> recommendations were not what we expecfed based on our pre meeting ar�d <br /> we were unprepared fio present you a logical depiction of our project. <br /> 1 . I am applying fior a permit to change my rooflines which wiCl enabl�o <br /> m� to crea�e 2 addifiional bedrooms and one bath for my children. The <br /> office space is existing as a loft now. 7here is room for an additional <br /> ' futur� 2nd floor bath that is outside of the 75' zone. • <br /> 2. There is no addition to the footprint of �he house, nor is there any <br /> increase in hardcover for this work. <br /> 3. lt is my unders�anding that the in�erior work on the exisfing main <br /> leve! does not require a dariance and therefor is applied for under a <br /> se�arate permit and should not come into play here creating a so called <br /> total house redo fior this variance. We have paid �or the necessary <br /> structural engineering to assure you this will nofi be a tear down similar <br /> to the existing project a few doars down th� lakeshore firom us. <br />