Laserfiche WebLink
' , - <br /> Section B <br /> Ventilation Method <br /> (Choose either balanced or exhaust only) <br /> �Balanced,HRV(Heat Recovery Ventilator)or ERV(Energy Recov- Exhaust only <br /> ery Ventilator)—cfm of unit in low must not exceed continuous venti- Continuous fan rating in cfm <br /> lation rating by more than 100Y. <br /> Low cfm: High cfm: Continuous fan rating in cfm(capacity must not exceed �60 CFM <br /> continuous ventilation rating by more than 100%) <br /> Directions-Choose the method of ventilation, ba/anced or exhaust only. ealanced ventilation systems are typically HRV or ERV's. <br /> Enter the low and high cfm amounts. Low c m air flow must be equal to or greater than the required continuous ventilation rate and <br /> less than 100%greater than the continuous rate. (For instance,if the low cfm is 40 cfm,the ventilation fan must not exceed 80 cfm.J <br /> Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. <br /> Section C <br /> Ventilation Fan Schedule <br /> Descri tion Location Continuous Intermittent <br /> Panasonic FV08VKM motion sensor Powder Bath 50 cfm 80 cfm <br /> Panasonic FV08VKM motion sensor Full bath 50 cfm 80 cfm <br /> Directions-The ventilation fan schedule should describe what the fan is for, the location, cfm,and whether it is used for continuous <br /> or intermittent ventilation. The fan that is chose for continuous ventilation must be equa/to or greater than the/ow m air rating <br /> and less than 100%greater than the continuous rate. (For instance,if the low cfm is 40 cfm, the continuous ventilation fan must not <br /> exceed SO cfm.J Automatic controls may allow the use of a larger fan that is operated a percentage of each hour. <br /> Section D <br /> Ventilation Controls <br /> (Describe operation and control of the continuous and intermittent ventilation) <br /> Full 8�powder bath fan runs at 50 cfm �constant. Upon motion sensing- ramps up to 80 cfm for 30 minutes. <br /> Diredions-Describe the operation of the ventilation system. There should be adequate detail for plan reviewers and inspedors to verify design and <br /> installation compliance. Related trades also need adequate detail for placement of controls and proper operation of the building ventilation. If <br /> exhaust fans are used for building ventilation,describe the operation and location of any controls,indicators and legends. lf an ERV or HRV is to be <br /> installed,describe how it will be installed.If it will be connected and interfaced with the air handling equipment please describe such connections as <br /> detailed in the manufactures'instollation instructions.If the installation instructions require or recommend the equipment to be interlocked with the <br /> air handling equipment for proper operation,such interconnection shalJ be made and described. <br /> I <br />