My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00101 - mechanical
Orono
>
Property Files
>
Street Address
>
E
>
Elmwood Avenue
>
1161 Elmwood Avenue - 07-117-23-14-0073 - New PID
>
Permits/Inspections
>
2014-00101 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:31:58 PM
Creation date
7/27/2016 2:34:50 PM
Metadata
Fields
Template:
x Address Old
House Number
1161
Street Name
Elmwood
Street Type
Avenue
Address
1161 Elmwood Ave
Document Type
Permits/Inspections
PIN
0711723140073
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°s°�> ���:� <br /> .. _ . �p` � <br /> , �'. <br /> site address 1161 Elmwood Ave, Orono oate 11/26t2013 <br /> Contractor Sabre P& H Completed <br /> Todd B. <br /> �v <br /> Section A <br /> Ventilation Quantity <br /> (Determine q N1104.2 or Equation 11-1) <br /> Square feet(Conditioned area including 2978 150 Cfm <br /> easement—finished or unfinished) Total required ventilation <br /> 5 75 cfm <br /> Number of bedrooms Continuous ventilation <br /> Directions-Determine the total and continuous ventilation rate by either using Table N1104.2 or equation 11-1. <br /> The table and equation are below. <br /> Table N1104.2 <br /> Total and Continuous Ventilation Rates(in cfm) <br /> Number of Bedrooms <br /> 1 2 3 4 5 6 <br /> Conditioned space(in Total/ Total/ Total/ Total/ Total/ Total/ <br /> sq.ft.) continuous continuous continuous continuous continuous continuous <br /> 1000-1500 60/40 75/40 90/45 105/53 120/60 135/68 <br /> 1501-2000 70/40 85/43 100/50 115/58 130/65 145/73 <br /> 2001-2500 80/40 95/48 110/55 125/63 140/70 155/78 <br /> 2501-3000 90/45 105/53 120/60 135/68 150/75 165/83 <br /> 3001-3500 100/50 115/58 130/65 145/73 160 80 175/88 <br /> 3501-4000 110/55 125/63 140/70 155/78 170/85 185/93 <br /> 4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 <br /> 4501-5000 130/65 145/73 160/80 175/88 190/95 205/103 <br /> 5001-5500 140/70 155/78 170/85 185/93 200/100 215/108 <br /> 5501-6000 150/75 165/83 180/90 195/98 210/105 225/113 <br /> Equation 11-1 <br /> (0.02 x square feet of conditioned space)+[15 x(number of bedrooms+1)]=Total ventilation rate(cfm) <br /> Total ventilation—The mechanical ventilation system shalt provide sufficient outdoor air to equal the total ventilation rate average, <br /> for each one-hour period according to the above table or equation. For heat recovery ventilators(HRV)and energy recovery venti�a- <br /> tors(ERV)the average hourly ventilation capacity must be determined in consideration of any reduction of exhaust or out outdoor <br /> air intake,or both,for defrost or other equipment cycling. <br /> Continuous ventilation-A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm,shall be provided,on a con- <br /> tinuous rate average for each one-hour period. The portion of the mechanical ventilation system intended to be continuous may <br /> have automatic cycling controls providing the average flow rate for each hour is met. <br /> G:\SAFETY�JK\Vent-makeup-comb air submittal(2).docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.