Laserfiche WebLink
of the building during the entire construction period. <br /> 1.15 The Contractor shal� cooperate with the Owner in the scheduling and the <br /> execution of the work and the use of the site, and make every effort to keep <br /> site clean & free of debris on daily basis so to not interfere with the use of the <br /> existing building. <br /> �ection 0115- Base Bid <br /> 1.1 The Base Bid shall include architectural; mechanical; plumbing; and electrical <br /> work as required to complete the remodeling and additions as drawn and <br /> specified, and costs shall be divided into these four separate areas of work. <br /> Include all alternates and cost allowances as separate items to Base Bid. <br /> Contractor to provide his own bid form on letterhead including all items <br /> mentioned. In addition to the above items, the Base Bid shall have separated <br /> costs according to the following areas of work. <br /> 1. Cabinets. <br /> 2. Millwork. <br /> 3. Concrete & masonry work. <br /> 4. Drywall & plaster. <br /> 5. Plumbing fixtures & faucets. <br /> 6. Colored concrete. <br /> 7. Windows & exterior doors. <br /> 8. Finish hardware. <br /> 9. Electrical Fixtures. <br /> 10. Tile work. <br /> 11. Retaining Wall. <br /> Section 0120 - Alternates <br /> 1. Alternate A (add) - The Contractor shall furnish a Performance Bond and <br /> Labor and Material Payment Bond (AIA Document A311) for the project. <br /> 2. Alternate B (add) - Refer to 1st Floor Plan, Sheet Al, & Room Finish <br /> Schedule. Provide cost for adding veneer plaster system to walls & ceiling, <br /> room 101; ceilings @ rooms 102, 103, & 104. <br /> 3. Alternate C (add) - Refer to 1st Floor Plan, Sheet A1, & Keynote #40. Provide <br /> cost for adding stamped brick pattern to colored concrete patio slab, landing & <br /> walk to pool deck. <br /> 4. Alternate D (add) - ReEer to crawl space below room 101. Provide cost for <br /> adding concrete slab over entire crawl space. <br /> 5. Alternate E (deduct) - Provide separated cost Eor substituting board & batten <br /> materials to be 3/8" rough sawn cedar plywood, exterior glue (provide sample <br /> for Owner) for board face in lieu of 1x12 cedar. Battens to remain cedar, d & <br /> better, 2 5/8" (1 x6 cut) x 3/4". <br /> 5 <br />