Laserfiche WebLink
If the tanks have less than 2' of cover, the lids, risers 8 maintenance hole covers <br /> must be insulated to a value of R1Q. <br /> Cleanouts for each lateral must be insulated & be accessible from finished grade in <br /> an irrigation box with a batl valve. <br /> Afl neighboring welfs are located greater than 100' away from the proposed <br /> treatment area, The existing wel! was abandoned. <br /> Keep afl heavy equipment off of the proposed treatment area before and after <br /> constructeon. The treatment area should be nnarked off before construction. This <br /> design is not valid 8� the system will need to be relocated if failure to protect the <br /> sites for new on-site sewage systems. <br /> MANAGEMENT PLAN: <br /> The tanks need to be maintained at a minimum of 1 tlme every 2 years, check with <br /> you pumper to set up a schedule. <br /> Systert� inspected for areas by owner 8 or Inspector as determined by the local unit <br /> of Governrt�ent. <br /> Any other requirements as deterrnined by the local unit of Gov�rnment. <br /> With proper "rnstallation 8� maintenance, th[s system should have no probtem In <br /> treating septic effluent effectively. <br /> Nothing other than human waste, toilet tlssue, laundry, showers, water softners etc. <br /> should be disposed af into the system. Recommend iron fllters be diverted out of the <br /> systern. Garbage disposals are not recommended. Excessive amounts of soaps� <br /> antibacterial soaps, cleaning agents, shower cleaners used every shower 8� chlorine <br /> agents may kfll the 6acteria needed to treat septic effluent. Additives are not <br /> recommended. Recommend laundering be Itmited to 3 to 4 loads per day. <br /> Steven B. Sahirmers <br /> I <br /> ; <br /> i <br /> i <br /> i <br /> � <br /> i <br /> � <br /> I <br /> i <br /> � <br />