My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Preliminary Septic Design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road - (AKA: Co. Rd. 84)
>
3960 Bayside Road - 05-117-23-22-0016 - 2nd New PID
>
3960 Bayside Rd - 05-117-23-22-0007 - Old PID
>
Correspondence
>
Preliminary Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:19:57 PM
Creation date
7/7/2016 4:18:03 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
Bayside
Street Type
Road
Address
3960 Bayside Rd
Document Type
Correspondence
PIN
0511723220016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r - SP TESTING INC. <br /> Steven B.Schirmers -951 Katydid Lane NE-St.Michael� MN 55376 <br /> Cert.No 627 - State License#394 - Phone 763-497-3556 - Fax 763-497-5Q11 <br /> www sutestin�wastewaterCa)comcast.net- schirmerswastewater.com <br /> dune 14, 2016 � ��' �� <br /> r�� � ��� <br /> / � <br /> Modern Construction ' <br /> 3980 Bayside Rd. a ��U,/] �� �/` J�'P�� � <br /> Orono, MN �� <br /> l' � <br /> �p <br /> � a �'a G'� � �� �� <br /> ��� � ��a � �� � <br /> This onsite sewage treatment systern is designed for a Type 1 system, Type 1, 5 <br /> bedroom home in accordance with the Minnesota Pollution Control Agency chapter <br /> 7080 8. local ordinances. <br /> The soils on this slte are a clay loam, The seasonally saturated soit, rnottted soil <br /> (redox features) were present at a depth of 12" to 22". A pressurized mound system <br /> will be installed. The bottam af the treatment area must be located at least 3' above <br /> mottled soil. Approval will be needed for the end slope o!the mound to be 90' from <br /> the property line. The absorption area will be 25' from the property line. Withoat <br /> approval the mound wili only support 4 bedroams. <br /> The concrete pad at the east end of the mound Is tocated in the end slope, not in the <br /> absorption area of the mound. The pad will need to be removed &, the small pites of <br /> sail 8� mixed cancrete. <br /> The existing tanks wilf need to be abandoned, pumped 8� fifled with soil & a tank <br /> abandonment report completed by a licensed contractor. <br /> A pumping chamber will need to he installed to lift the effluent to the treatment area. <br /> The power supply 8� switches rnust be located outside the manhole 8 pumping <br /> chamber in a weather proof enclosure. A warning devlae must be installed with a <br /> light & sound device, this is in case of a pump failure. <br /> The manifold & supply line must have back drainage to the pumping chamber. The <br /> distribution pipes.shall have their ends capped. Se sure the rock 8� sand fill material <br /> are cfean. The sod layer below the entire mounded area must be turned over, just <br /> break up the sod. <br /> All property lines enust be lacated prior to installation. <br /> � <br /> i <br /> I <br /> i <br /> � <br /> � <br /> I <br /> � <br /> I <br /> i <br /> � <br /> i <br /> I <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.